【In-depth Discussion on Modular Installation of HaiChuan】Construction Example – Hazard Rectification Project for the Second Vacuum Distillation Unit at Qilu Petrochemical Refinery

2018-11-08View Original

Thread Content

The safety hazard remediation project for the second atmospheric and vacuum distillation unit at Qilu Petrochemical Refinery is a key task during this spring maintenance campaign; it features a tight schedule and high difficulty. To shorten the construction period, the contractor, Shandong Qilu Petrochemical Construction Co., Ltd., adopted modular installation for the framework structure for the first time.
Reply #22018-11-08
Everyone is welcome to participate in the following series of sharing discussions; clicking on the link will take you there. -------------------------------------------------------------------------- This is a compilation post for the 【Guess the Haichuan Equipment】 series – all equipment enthusiasts are encouraged to join in! https://bbs.hcbbs.com/thread-2079686-1-1.html (Source: Haichuan Chemical Industry Forum) Summary post for the 【Haichuan. Pioneers in the Chemical Industry】 series. https://bbs.hcbbs.com/thread-1842627-1-1.html (Source: Haichuan Chemical Industry Forum) Everyone is welcome to support the activities in the leisure section; just click on the link below to access it. There’s also a link to the Haichuan Leisure Section – Food and Tourism Edition, which offers online travel experiences for the National Day holiday. Rules for the first “Love Haichuan, Love Photography” competition focused on chemical industry-related photography. Summary post for the 【Haichuan Modular Installation Discussion】 thread; everyone is welcome to participate in the discussions! https://bbs.hcbbs.com/thread-1773168-1-1.html (Source: Haichuan Chemical Industry Forum Website)
Reply #32018-11-08
The prefabricated frames for this modular installation are divided into three modules, weighing 62 tons, 130 tons, and 150 tons respectively. On March 8, the old heat exchanger area began to be demolished. On the evening of March 17, the first lift of the framework began. On Saturday morning, March 18th, the second lift of the framework began.
Reply #42018-11-08
This frame is 21 meters high, 12 meters long, and 8 meters wide, weighing 130 tons; it was the most challenging piece to lift in this operation. The lifting operation radius is 18 meters, while the positioning operation radius is 36 meters. The 650-ton crawler crane lifted the load while empty; after adjusting its orientation, a 200-ton super counterweight was attached and the crane moved on the ground for about 12 meters.
Reply #52018-11-09
Compared to it, on-site prefabrication and welding are much faster
Reply #62018-11-09
The issue in this case is the lack of space on site, as well as the short amount of time available for use
Reply #72018-11-09
Welcome to participate in the discussions of this series
Reply #82019-02-20
You can post a dedicated thread on the forum to share it

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.