HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

[Haichuan Chemical Salary News] Environmental impact assessment approved for 1 million tons/year coal-to-methanol project with acetic acid co-production in Ordos, Inner Mongolia – public announcement

2020-04-10View Original

Thread Content

The environmental impact assessment for Inner Mongolia’s 1 million tons per year coal-based methanol and acetic acid production project has been approved. On April 7, the Ordos Environmental Protection Bureau, in accordance with the relevant regulations regarding the approval process for environmental impact assessments of construction projects, decided to issue its approval decision regarding the environmental impact assessment document for the \"1 million tons per year acetic acid production project of Inner Mongolia Zhuozheng Coal Chemical Co., Ltd.\" To ensure the seriousness and fairness of this review process, the basic information regarding the environmental impact assessment documents for which approval is to be granted is being made public. The period of public disclosure begins on April 7, 2020, and lasts for (5 working days).
Reply #22020-04-10
Project Name: 1 million tons per year acetic acid project of Inner Mongolia Zhuozheng Coal Chemical Co., Ltd.
Location: Nalinhe Chemical Industry Zone, Sulihe Economic Development Zone, Wushen Banner
Developer: Inner Mongolia Zhuozheng Coal Chemical Co., Ltd.
Environmental Impact Assessment Agency: Inner Mongolia Huankeyuan Environmental Technology Co., Ltd.
Project Overview: The scale of this project is 1 million tons per year of acetic acid production. Using coal as raw material, the project employs multi-nozzle water-coal slurry gasification, sulfur-resistant shift reaction, low-temperature methanol washing, low-pressure methanol synthesis, and five-column distillation processes to produce high-purity methanol, which is then used in low-pressure carbonylation reactions to produce acetic acid. The capacity of the coal-to-gas plant is 206,476 Nm3/h (effective gas: CO + H2); the capacity of the methanol plant is 54.1×104 tons per year, while the capacity of the acetic acid plant is 100×104 tons per year. The capacity of the air separation plant is 90,000 Nm3/h. The main construction components include the core facilities such as the coal-to-gas plant, methanol plant, acetic acid plant, and air separation plant, as well as the auxiliary systems such as water supply and drainage systems, heating systems, solid material storage and transportation systems, and liquid material storage and transportation systems. The total investment for this project is 5,014,557,500 yuan, of which 2,841,000,000 yuan is allocated to environmental protection measures.
Reply #32020-04-10
Starting with 100,000 yuan, President Gao’s business grew bigger and bigger.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.