Thread Content
There are some industrial parks in the country where wastewater treatment plants have been built, but there are no corresponding wastewater pipelines. As a result, the companies involved must cover the costs themselves, acquire the land, and construct the pipelines, and this aspect often becomes a source of conflict between the companies and the parks. Who should be responsible for building the sewage pipelines connecting chemical plants to the park’s sewage treatment plant?
======================================================================== I’m promoting several series of posts that I’ve compiled; everyone is welcome to participate actively. ------------------------------------------------------- Everyone is invited to join the discussions in these series – just click on the links to access them. -------------------------------------------------------------------------- There’s a compilation post for the 【Haichuan Equipment Guessing Game】 series; all equipment enthusiasts are encouraged to take part! https://bbs.hcbbs.com/thread-2079686-1-1.html (Source: Haichuan Chemical Industry Forum) Summary post of the [Haichuan. Pioneers in the Chemical Industry] series. https://bbs.hcbbs.com/thread-1842627-1-1.html (Source: Haichuan Chemical Industry Forum) Summary post for the [In-depth Discussion on Modular Installation in Haichuan]; everyone is welcome to participate in the discussions! https://bbs.hcbbs.com/thread-1773168-1-1.html (Source: Haichuan Chemical Industry Forum) [Haichuan – ‘Strange Safety Hazards in Season 4’ compilation thread; it is being updated continuously. Everyone is welcome to join the discussions.] https://bbs.hcbbs.com/thread-2748458-1-1.html (Source: Haichuan Chemical Industry Forum) The ‘Guess the Food’ series of compilation threads is also being updated continuously – with thousands of different foods, can you recognize them all? https://bbs.hcbbs.com/thread-2142205-1-1.html (Source: Haichuan Chemical Industry Forum) [Haichuan Chemical Industry Site] Compilation post on nitre caves – why did ancient people produce nitre in caves? ? https://bbs.hcbbs.com/thread-2145992-1-1.html (Source: Haichuan Chemical Industry Forum)
Generally, the park authority is responsible for the construction. Special cases require special treatment.
I have seen some truly excellent industrial parks, such as the Shanghai Chemical Industry Park and the Nanjing Chemical Industry Park. These parks have clear planning objectives, with proper infrastructure in place (in some cases, even seven types of infrastructure), creating conditions that attract businesses to settle there. I’ve also seen some really poor industrial parks: they just mark out a piece of land, build a road, put up a sign, and then start attracting businesses, acting as if they’re welcoming guests when the doors are open but treating them badly once the doors are closed. Three connections and one leveling: water supply (supply and drainage), electricity supply, road access, and land leveling ; Five connections and one leveling: water supply, electricity supply, road access, ventilation, communication, and land leveling ; Seven connections and one leveling: water supply, electricity, road access, postal service, communication networks, heating, natural gas or coal gas supply, and land leveling.
The feasibility study report for the park planning includes the design of the park’s main network. The user only needs to make contact
This is nothing but bullying; attracting investment becomes an empty promise. Normally, everything within one meter outside a company’s boundaries falls under the responsibility of the industrial park and has nothing to do with the company itself. Moreover, before commencing operations, the company must have the capability to handle waste disposal
I once invested in an industrial project in an economic development zone in northern Jiangsu. Across the road from the site of the project was the park’s sewage treatment plant (operated by a third-party investor), but its processing capacity was already saturated, so connection to it was not allowed. Question: When will the park resolve the sewage discharge issue? Answer: After the expansion of the wastewater treatment plant. Question: When will the expansion be completed? (There are no signs of any construction work, as far as I can tell.) Answer: Wait until the investors make their investments. Question: So when will our project go into operation (it’s already built)? Answer: It will be put into operation once built. Question: So where is the wastewater discharged? What to do if the environmental protection authorities come to inspect? Answer: First, discharge it into the drainage ditch; suspend production temporarily during inspection. .........
Taking into account your and the sixth floor’s opinions, it would be best for the park to build a proper sewage pipeline system, leaving an interface for future companies
Then there is a question: how large should the reserved pipeline be? ? ? Who should be responsible for designing this?
The entrance fees might vary depending on the park; for example, there are restaurants of different grades, catering to guests at various levels
For example, if the enterprises entering the park have special types of wastewater, do they have to treat it internally? ? ?