Project Name: Ouyang Zhucheng Wind-Hydrogen Integrated Green Power Hydrogen Production Industry Demonstration Project. Launch Date: December 24, 2025. Location: Shandong. Industry/Project Type: Electricity/Wind Power/Wind Energy; New infrastructure and new industries / New industries / Hydrogen energy. Project owner: Daxiang ChaoNeng New Energy (Weifang) Co., Ltd. Total investment amount: 590.65 million yuan. Current progress: Preliminary review for land use. Location of construction: Jiayue Town and Shiqiaozzi Town, Zhucheng City, Weifang City, Shandong Province. Scope of construction: The wind power project will have a capacity of 100 MW; 16 wind turbines with a capacity of 6.25 MW each are planned to be installed. A 220 KV substation (not part of the power grid infrastructure) will also be built, along with a hydrogen production plant capable of producing 4,000 Nm3/h of hydrogen. The designed annual electricity generation capacity is 261.986 million kWh, while the annual hydrogen production volume can reach 593.34 tons. Progress milestone: On December 19, 2025, a pre-examination and site selection report for the Ouyang Zhucheng Wind-Hydrogen Integrated Green Power Hydrogen Production Industry Demonstration Project was made public prior to approval (pre-examination for construction land use). On September 5, 2025, the project was assigned a code in July. (Project registration)
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first commercial supercritical carbon dioxide power generation unit was successfully put into operation in Liupanshui, Guizhou, from 2911 to 2025. https://bbs.hcbbs.com/thread-5708920-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】The first domestically produced high-sulfur content compression unit at the Puguang Gas Field has operated for over 20,000 hours (2914–2025) https://bbs.hcbbs.com/thread-5709131-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】2915-2025 – Amazing! China achieves for the first time the high-temperature cooling and transportation of oil, gas, and water mixtures using offshore unmanned platforms https://bbs.hcbbs.com/thread-5709132-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The first electrocracking furnace in China was successfully put into operation at Dushanzi Petrochemical Company between 2016 and 2025. https://bbs.hcbbs.com/thread-5709248-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2018 to 2025, Shandong Zhanggu successfully developed its first domestically produced TEP steam compressor, which was then shipped out. https://bbs.hcbbs.com/thread-5709282-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The pilot production base of the Hami High-Oil Coal Research Institute, covering the period 2020–2025, was officially put into use in Yiwu County. https://bbs.hcbbs.com/thread-5709304-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest single PEM hydrogen production electrolyzer was successfully produced at CRRC in Zhuzhou from 2021 to 2025. https://bbs.hcbbs.com/thread-5709309-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2024 to 2025! ! Two breakthroughs in domestic high-end electric drives: ultra-high-speed motors capable of operating at tens of thousands of revolutions per minute, as well as motors with a vacuum distribution capacity of 100,000 units, have passed the evaluation process. https://bbs.hcbbs.com/thread-5709405-1-1.html (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))