Thread Content
The pressure testing of the 20,000 m³ low-temperature ethylene tank in Tarim’s 1.2 million tons/year Phase II ethylene project was completed successfully. On December 7th, with the final pressure strength test results confirming accuracy, good news came from this tank area: all 52 pressure testing units there were successfully tested, passing the inspections with a high standard of \"zero leaks\". This achievement provides a valuable advantage for ensuring the safe operation of the facility throughout the winter, and it lays a solid foundation for meeting the goals set for December 30th.
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Unsecured and Not Properly Sealed Pipe Insulation Aluminum Foil https://bbs.hcbbs.com/thread-5708978-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion. https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest 9600 Nm³/h multi-functional hydrogen production BOP system was successfully delivered https://bbs.hcbbs.com/thread-5708761-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2009 to 2025, Ningmei Group made significant progress in the key technologies related to the extraction of rare gases such as krypton and xenon from ultra-large air separation units. https://bbs.hcbbs.com/thread-5708777-1-1.html (Source: Hachuan Chemical Industry Forum (Hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】The first domestic emergency drill on land for 1,500-meter-class ultra-deep-water submarine pipelines was successfully carried out from 2010 to 2025. https://bbs.hcbbs.com/thread-5708788-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first commercial supercritical carbon dioxide power generation unit was successfully put into operation in Liupanshui, Guizhou, from 2911 to 2025. https://bbs.hcbbs.com/thread-5708920-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2895-2025: The Sixth Academy of Aerospace Engineering built China’s first commercial liquid hydrogen refueling station, which was officially put into operation in Panzhihua. https://bbs.hcbbs.com/thread-5708004-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first commercial supercritical carbon dioxide power generation unit was successfully put into operation in Liupanshui, Guizhou, from 2911 to 2025. https://bbs.hcbbs.com/thread-5708920-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first domestically produced high-sulfur content compression unit at the Puguang Gas Field has operated for over 20,000 hours (2914–2025) https://bbs.hcbbs.com/thread-5709131-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】2915-2025: Amazing! China achieves for the first time the high-temperature cooling and transportation of oil, gas, and water mixtures using offshore unmanned platforms https://bbs.hcbbs.com/thread-5709132-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))