Do you know what this device is that you saw in an overseas project report? What domestic installations have used this equipment?
To promote several series of posts compiled by myself, everyone is welcome to participate. ------------------------------------------------------------- Welcome to participate in the following series of sharing and discussions. Click the link to open it. ----------------------------------------------------------------------------- [Ocean Equipment Guess] series of summary posts, all Haichu friends are welcome to participate! https://bbs.hcbbs.com/thread-2079686-1-1.html (Source: Haichuan Chemical Forum Network) [Ocean. Chemical Industry Pioneer] Series Summary Posts https://bbs.hcbbs.com/thread-1842627-1-1.html (Source: Haichuan Chemical Forum Network) [Haichuan Modular Installation Discussion] Summary of posts, everyone is welcome to discuss! https://bbs.hcbbs.com/thread-1773168-1-1.html (Source: Haichuan Chemical Forum Network) [Haichuan [Ocean's Strange Safety Hazards Season 4] summary post, constantly updated, everyone is welcome to participate in the discussion https://bbs.hcbbs.com/thread-2748458-1-1.html (Source: Haichuan Chemical Forum Network) Guess the Ingredients】The series of summary posts is continuously being updated. Can you recognize thousands of foods? https://bbs.hcbbs.com/thread-2142205-1-1.html (Source: Haichuan Chemical Forum Network) [Haichuan Chemical Site] summary post, continuously updated!!! Welcome to enjoy https://bbs.hcbbs.com/thread-2145992-1-1.html (Source: Huahaichuanliu-Haichuan Chemical Forum Network)
I have never seen such a slender tower. Is it a scene in the Middle East?
It’s not a scene in the Middle East. Just look at the blue sky and you’ll know there are white clouds.
This equipment is still upright and relatively thick. It feels like the wall thickness is quite thick.
See the polyethylene device logo equipment----microphone reactor.
The two brothers are often together, but now the polyethylene reactors of many projects are no longer microphones, but have been replaced with large ladders and loop reactors.
With a diameter of 59 meters and a weight of 220 tons, it is the largest and heaviest equipment in the project. The main crane uses a 1,600-ton crawler crane, and the tail slide weighs 108 tons, using a 600-ton crawler crane. The equipment needs to be elevated at least 40 meters, pass over the top of the reaction frame, and pass down from the 40-meter high level.