Thread Content
0 Municipal Safety and Quality Supervision: During the high temperature yellow warning, no outdoor work is allowed from 11 am to 15 pm 4 hours ago?·?Creator in the field of high-quality local information At present, the city is about to enter the midsummer high temperature season. In order to implement the "Occupational Disease Prevention and Control Law", the "Management Measures for Heatstroke Prevention and Cooling Measures" and other laws and regulations, we must do a good job in heatstroke prevention and cooling at construction sites and ensure construction safety. Here are the following reminders on relevant matters:: 1. Strictly implement the leadership system. Project managers and project directors must strictly implement the leadership system to ensure the normal operation of the construction site safety management system. ; The person in charge of the construction unit shall, in accordance with the inspection requirements on a shift basis, inspect the construction site at least once a month to check the operation of the project's production safety management system. The supervision unit should urge the construction unit to implement the production system with shifts ; The working hours of the project management team of the on-site construction unit and the supervision unit must be consistent with the working hours of the on-site construction team. Especially during the current high-temperature construction season of "working at both ends and resting in the middle" and other holidays and weekends, management must be in place to ensure the normal operation of the production safety management system. 2. Strictly carry out safety education and safety communication before construction. The project department of the general contractor must strengthen the inspection of safety production conditions before starting work every day, implement safety technical measures, and conduct safety education, safety communication and emergency training for high temperature seasons. At the same time, it urges each subcontracted labor operation team to do a good job in safety education and safety communication before work to ensure safe production. 3. Strictly carry out labor protection work in the summer season. When the Shanghai Central Meteorological Observatory issues a high temperature yellow warning signal, the construction unit should adopt the method of "working at both ends and resting in the middle" to shorten the continuous working time of workers. During the high temperature period during the day (11 a.m.: 00 to 15 pm: 00) Outdoor open-air operations are not allowed. When the Shanghai Central Meteorological Observatory issues a high-temperature orange warning signal, in addition to complying with the provisions of the preceding paragraph, outdoor open-air operations are not allowed until the high-temperature warning is lifted. 4. Strictly provide humanistic care during high-temperature seasons. Each construction unit must reasonably adjust its work and rest time, and at the same time strictly abide by civilized construction management regulations and night construction permit management regulations. Construction is strictly prohibited from disturbing residents, and the basic work and rest time of workers and surrounding residents are guaranteed. Each construction unit should provide sufficient heatstroke prevention and cooling supplies and necessary emergency medicines that meet health standards for personnel working in hot weather at the construction site to create a safe and healthy working environment. When hot weather comes, construction units should conduct health examinations for workers working in hot weather, and adjust their working positions for workers suffering from heart, lung, cerebrovascular diseases, tuberculosis, central nervous system diseases and other physical conditions not suitable for high-temperature working environments. The health of workers should be observed before work every day, and their body temperature and blood pressure should be measured. If their physical health is abnormal, they should be arranged to take a rest or be advised to seek medical treatment as appropriate. All parties involved in the construction shall not force the construction unit and workers to carry out high-temperature outdoor construction operations on the grounds of construction period.
As it should be, outdoor work is prohibited in hot summer weather. In addition, ventilation and cooling should also be paid attention to when working in a confined space. Working in the summer is miserable.