HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

With rising natural gas prices, Total has shut down its 43,500 barrels per day mild hydrocracking unit (MHC).

2021-10-14View Original

Thread Content

Total has shut down its 43,500 barrels per day mild hydrocracking unit (MHC). The facility is located at the Antwerp refinery in Belgium, with a daily production capacity of 360,000 barrels. Due to economic reasons, the unit was shut down on October 8, 2021, and is expected to remain offline for the time being. This is because expensive natural gas results in losses in hydrogen production. It is estimated that some hydrocracking and processing units are also shut down, but it has not been reported.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.