Thread Content
This post was last edited by Desert Fish on 2021-7-17 at 11:50. In 1958, China’s first welded pipe production line was established in Baoji; in 1959, China’s first spiral single-sided submerged arc welded pipe was produced there. In 1960, Baoji Steel Pipe succeeded in producing China’s first batch of welding flux. At the same time, Baoji Steel Pipe has actively assisted in the development of various pipe manufacturing enterprises in China, including those in Shashi and Qingxian. In 2009, it built the world’s third continuous coiled tubing production line; since then, Baoji Steel Pipe has seen its output value exceed 10 billion yuan for four consecutive years. Baoji has become one of China’s most important bases for oil equipment.
【History of Haichuan Pipes】October 27, 1953: The first hot-rolled seamless steel pipe was produced. https://bbs.hcbbs.com/thread-3238467-1-1.html (Source: Haichuan Chemical Forum – Huahai Chuanliu) 【History of Haichuan Pipes】September 26, 1964: Production of pneumatic slide valves began. https://bbs.hcbbs.com/thread-3238027-1-1.html (Source: Haichuan Chemical Forum – Huahai Chuanliu) 【History of Haichuan Pipes】In 1957, the Lanlian Machinery Factory began producing seamless elbows. https://bbs.hcbbs.com/thread-3238019-1-1.html (Source: Haichuan Chemical Forum – Huahai Chuanliu) 【History of Haichuan Pipes】China’s first factory for producing seamless steel pipes made from special steels was established. https://bbs.hcbbs.com/thread-3238877-1-1.html (Source: Haichuan Chemical Forum – Huahai Chuanliu) 【History of Haichuan Pipes】In 1959, China’s first spiral single-sided submerged arc welded pipe was produced at Baoji Steel Pipe Factory. https://bbs.hcbbs.com/thread-3238978-1-1.html (Source: Haichuan Chemical Forum – Huahai Chuanliu)
It’s memorable. Old photos refer to those that are treasured
There’s a saying: for steel production in the world, one looks to China; and for steel production in China, one looks to Hebei