Thread Content
HaiChuan celebrates the 73rd anniversary of the motherland; witness the great development in chemical engineering equipment. Replies will be rewarded – discussions are welcome. ---------------------------------------------------------- On September 7, 2022, the CEP offshore oilfield central platform complex, which is part of the largest new crude oil production project in 2022 at the Bohai Oilfield – the Kenli 6-1 Oilfield Development Project – was completed on land at the Qingdao site. The Kenli 6-1 CEP module that has been completed in this construction is an 8-leg central processing platform equipped with over 130 sets of equipment, including a residential building for 80 people. With a designed weight of 15,500 tons, it is the heaviest platform module built so far in the Bohai Sea oil field. The total height of its upper block is approximately 36.5 meters ; It is 68 meters long and 68 meters wide.
Seven Days of National Day Fun – More Participation from Haichuan’
The Kenli 6-1 CEP module project features an 8-leg central processing platform equipped with over 130 sets of equipment, including a residential building that can accommodate 80 people. Its designed weight is 15,500 tons, which is equivalent to the weight of nearly two Eiffel Towers; it represents the heaviest floating module used in the Bohai Sea oil field to date. The total height of its upper module is approximately 36.5 meters, exceeding the height of a 10-story building. It measures 68 meters in length and 68 meters in width, with a projected area equivalent to that of 11 basketball courts
Impressive. Thank President Yu for not forgetting to focus on forum development during National Day. Like.