HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

[Ten years of development of chemical equipment] 627-2022 Tianjin Nangang ethylene 200,000 tons/year LAO unit's first loop reactor is hoisted as a whole

2022-11-18View Original

Thread Content

Look at the great development of chemical equipment in the past ten years and praise China's prosperity and prosperity. Replies will be rewarded and discussed. ---------------------------------------------- On November 15, the first loop reactor of the Tianjin Nangang ethylene 200,000 tons/year LAO unit, the largest domestic linear alpha olefin production unit located in Nangang Industrial Zone, Tianjin Economic Development Zone, was successfully hoisted in one go through a single 6-set loop pipe "Sun" shaped integral frame assembly method. This is the first time in China. This method of hoisting reduces the safety risks of high-altitude operations, shortens the construction period, and opens a new chapter in domestic loop reactor installation. The 200,000 tons/year LAO unit is one of the 13 units under construction in the Tianjin Nangang Ethylene Project. The loop reactor is the core equipment of the unit, and its design and installation quality are directly related to the long-term smooth operation of the unit. The device has a total of 2 loop reactors, each reactor is composed of 6 reaction tubes connected in series, with a total weight of more than 320 tons. This hoisting abandoned the conventional installation method of single-chip single-chip crane, and innovatively adopted a new hoisting mode of integrally prefabricating the loop reactor and "Sun"-shaped group frame. Since the reactor is overall arranged on a concrete frame with an elevation of 6.8 meters, the installation accuracy is extremely high. In order to ensure the successful completion of the installation task, Tianjin Petrochemical worked with participating units to deeply optimize the reactor design plan, conduct in-depth discussions on the installation of the reactor's basic positioning template, and review the installation position of the positioning template multiple times to ensure that the design accuracy and prefabrication accuracy meet the needs of manufacturing, construction and installation, and the reactor was successfully hoisted in one go.
Reply #22022-11-18
Gain knowledge and open your eyes, thank you for sharing
Reply #32022-11-18
Thumbs up for the great development of chemical equipment, thank you for sharing!
Reply #42022-11-18
[Guess what Haichuan Equipment has] Lifting a string of snake bones https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=3579673 (Source: Haichuan.com-Huahaichuanliu)
Reply #52022-11-18
[Guess what Haichuan Equipment has] Lifting a string of snake bones https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=3579673 (Source: Haichuan.com-Huahaichuanliu)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.