Thread Content
On December 21, the launch ceremony for key projects in Chaoyang City, Liaoning Province, and Jiuquan City, Gansu Province, as well as the groundbreaking ceremonies for these projects, were held via video conference and on-site events. Five strategic, pioneering, and model projects were launched simultaneously, with a total investment of over 20 billion yuan. The Gansu Jiuquan Integrated Demonstration Project for Hydrogen Storage and Comprehensive Utilization of Hydrogen Energy is funded and constructed by China Energy Engineering Group Hydrogen Energy Company. The project is planned to achieve an annual production of 17,000 tons of green hydrogen and 39,000 tons of green ammonia, along with related facilities; the total investment amounts to 7.625 billion yuan. In the first phase, the plan is to produce 7,000 tons of high-pressure gaseous hydrogen and 330 tons of liquid hydrogen per year, with an ammonia production capacity of 20,000 tons. Additionally, 85 megawatts of wind power and 130 megawatts of photovoltaic power will be installed as part of this phase, with an investment of 2.3 billion yuan for this phase alone. Upon completion, the project will become the first hydrogen energy utilization project in Gansu Province to integrate gaseous and liquid green hydrogen as well as green synthetic ammonia. It will help to achieve deep decarbonization in the traditional chemical industry, improve the local hydrogen energy industry chain structure, and facilitate the development of a local system for certifying green products.