Thread Content
This post was last edited by Desert Fish on 2022-12-22 at 21:46. Witnessing the ten-year rapid development of chemical processing equipment, we celebrate the prosperity and strength of modern China. This is just a preliminary contribution; we welcome everyone to participate more actively in discussions on this forum – the more people involved, the more lively it becomes. Haichuan becomes even better with you here. Replies are rewarded; feel free to discuss! ------------------------------------------------- At 18:58 on June 4, 2015, a 2,403-meter-long steel structure was pulled forward by horizontal directional drilling equipment from the north bank of the Yangtze River, emerging successfully after passing through the riverbed. Thus, the Jiujiang Yangtze River Crossing Project, the most important control project for the Yizheng-to-Jiujiang section of the pipeline network, was completed successfully. The employees of Xuzhou Shihua Pipeline Special Operations Co., Ltd., the pipeline company present, couldn’t help but high-five in celebration; the constant noise of the drilling machines at the construction site, which had been running 24/7 for over four months, finally ceased as well. The pipeline company took on the project for the Yizheng to Jiujiang section of the Chief Engineer Pipeline double line. The main route of this pipeline is roughly consistent with the Yizheng to Jiujiang section of the Yichang Pipeline, which was put into operation in 2006. The total length of the pipeline is 560 kilometers, and it passes through Jiangsu, Anhui, Hubei, and Jiangxi provinces. Once completed and put into operation, this dual-pipeline system will effectively address the issue of insufficient crude oil processing capacity for Sinopec’s related refining enterprises in the middle and lower reaches of the Yangtze River.