Thread Content
3.456 billion yuan invested in a demonstration project in Tongliao, Inner Mongolia – Author/Source: Huahua Net Coal Chemicals; Date: May 5, 2023; Clicks: 42. Recently, the integrated hydrogen and ammonia production demonstration project carried out by China Power (Tongliao) Energy Co., Ltd. in Tongliao was approved for implementation. Tongliao Hydrogen and Ammonia Production Integrated Demonstration Project. Project code: 2304-150526-04-01-686449. Project owner: China Electric (Tongliao) Energy Co., Ltd. Location of construction: Lubei Industrial Park, Zhalute Banner, Tongliao City. Total investment: 3,456 million yuan. Planned construction period: from October 2023 to October 2025. Scale and scope of construction: It is planned to build an electrolysis system for hydrogen production with a capacity of 140,000 Nm3/h; electrochemical energy storage systems with a capacity of 140 MW/280 MWh, as well as low-pressure gaseous hydrogen storage facilities with a capacity of 2.86 million standard cubic meters, will be used to supply green hydrogen as raw material for the production of 400,000 tons of ammonia per year. The main buildings include the electrolytic water hydrogen production plant, ammonia synthesis unit, tank farm, energy storage battery area, and comprehensive office building, along with supporting domestic wastewater treatment facilities and related equipment.