Thread Content
Ten years of rapid development in chemical engineering equipment – praise for China’s prosperity and strength. This is just a starting point; more participation will make things even more lively. Haichuan becomes even better with your involvement; we welcome everyone to join in the forum discussions. Everyone should pay attention to safety and know how to handle emergencies. *********************************************On June 5, 2023, the 2500T wind turbine installation platform “Haifeng 1001”, which was fully designed and constructed by Shanghai Zhenhua Heavy Industry, was successfully taken out of the dock at Base No. 4 in Nantong, Jiangsu, and headed towards the port at Nantong’s large-scale manufacturing complex. The installation platform is 133.8 meters long, 50 meters wide, and 11 meters deep, with a total weight of around 28,000 tons. It is equipped with a 2,500-ton jib-type full-turn crane on the starboard side at the stern; it is the wind turbine installation platform with the greatest lifting capacity ever built in China to date.
“The Haifeng 1001 \"2500T wind turbine installation platform is a self-propelled, self-elevating platform suitable for operations in sandy soil, clayey soil, or similar geological conditions, with a maximum operating depth of 70 meters. Its self-sustaining capacity is 45 days, range is 3,000 nautical miles, and speed is not less than 9 knots. This platform is primarily used for the installation of equipment on units with a capacity of 15 megawatts or more. It can carry two sets of 15-megawatt wind turbine units at the same time, is capable of operating in unlimited sea areas, meets the requirements for navigation in Class B ice zones, is certified by CCS, and flies the Chinese flag. It consists of the main hull, main and auxiliary cranes, 4 truss-type legs, 4 gear-rack lifting systems, etc. A 2,500-ton swing-type full-turn crane is installed on the starboard side at the stern of the platform, while a 380-ton auxiliary crane is located near the pile leg on the starboard side at the bow.
This platform is the wind turbine installation platform with the greatest lifting capacity ever built in China to date, and its design and construction have been fully localized. Upon completion, this platform will offer better solutions for future offshore wind turbine installations and foundation construction, having a profound impact on the field of offshore wind power development and contributing to the early achievement of the goals of \"carbon peak and carbon neutrality\".
【Ten Years of Great Development in Chemical Equipment】953–2023: 140-ton cyclohexanol dehydrogenation reactors https://bbs.hcbbs.com/thread-3759692-1-1.html (Source: Huahai Chuanliu – Haichuan Network)