Hoisting of the extrusion granulation module 5 for the Fujian Gulei Zhongsha PP project completed

2025-11-21View Original

Thread Content

The lifting of Module 5 for the extrusion granulation unit at the Fujian Gulei Sinopec PP project has been completed. Recently, the assembly and lifting work for Module 5 of the granulation unit at this project was successfully finished. During the construction period, the project team focused on achieving the set goals, strictly adhering to the requirements of the assembly plan. It first completed the leveling of the site foundation and the laying of the roadbed structure, to ensure that the load-bearing capacity met the needs of construction. During the assembly process, strict control is exercised over column axis deviation, verticality, and beam elevation errors. Given the strong winds in coastal areas, life lines and fall prevention nets are installed in advance to implement wind protection measures. During the lifting phase, the \"direct lifting method\" is employed. After assessing the strength of the lifting equipment and verifying the bearing capacity of the foundation, the operation is supervised by certified personnel to ensure that the modules are positioned accurately.
Reply #22025-11-21
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32025-11-21
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #42025-11-21
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 2834-2025 intelligent pipe full-position welding robot has been put into use officially. https://bbs.hcbbs.com/thread-5705686-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #52025-11-22
【Ten Years of Rapid Development in Chemical Engineering Equipment】2841-2025: Longyu’s low-temperature heat coupling distillation technology for coal chemical processing has been recognized https://bbs.hcbbs.com/thread-5705831-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62025-11-23
【Ten Years of Rapid Development in Chemical Processing Equipment】2842-2025 **The research on ‘Key Technologies for Surface Treatment of Storage Tanks in Pipeline Systems, as well as the Development and Industrial Application of Intelligent Maintenance Equipment’ has been evaluated as being at an internationally leading level** https://bbs.hcbbs.com/thread-5705865-1-1.html (Source: HaiChuan Chemical Industry Forum (HCBBS))
Reply #72025-11-23
【Ten Years of Rapid Development in Chemical Equipment】The world’s largest seamless steel pipe production line, 2843-2025, was officially put into operation at Shandong Guangfu Group. https://bbs.hcbbs.com/thread-5705991-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #82025-11-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】2844-2025: China’s first project for generating electricity from the residual pressure of high-pressure natural gas transmission pipelines – the Haimen Station natural gas residual pressure power generation project – has been put into operation in Nantong, Jiangsu. https://bbs.hcbbs.com/thread-5706004-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92025-11-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 2845-2025 2MW/600℃ ultra-high temperature heat pump energy storage demonstration project was successfully commissioned on its first attempt. https://bbs.hcbbs.com/thread-5706020-1-1.html (Source: Haichuan Chemical Engineering Forum (Hua Haichuan Liu hcbbs))
Reply #102025-11-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】China-made desalination modules for European methanol projects were officially delivered and shipped, 2829–2025 https://bbs.hcbbs.com/thread-5705395-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112025-11-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 2845-2025 2MW/600℃ ultra-high temperature heat pump energy storage demonstration project was successfully commissioned on its first attempt. https://bbs.hcbbs.com/thread-5706020-1-1.html (Source: Haichuan Chemical Engineering Forum (Hua Haichuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.