Installation of key large-scale equipment exceeding 1,000 tons for the 300,000 tons/year PEO production facility in Rongsheng New Materials project completed

2026-01-19View Original

Thread Content

On January 6, 2026, a significant milestone was reached at the Rongsheng New Materials project’s 300,000 tons per year PEO production facility: all four key large-scale equipment units within the 10A reaction framework were safely and precisely installed, marking the official conclusion of the equipment installation phase of the project. The four pieces of equipment lifted in this batch are core components of the plant’s process flow, and their successful lifting marks a milestone for the entire project. The reactor/gas cooler (1225-R-0110) has a net weight of 1,063 tons, making it the heaviest single piece of equipment in the facility at present; its installation elevation is 20.85 meters. Reactor gas cooler drum (1225-V-0110), weighing 232 tons. The reactor gas cooler drum (1225-V-0112) weighs 120 tons and has an installation height of 18.15 meters. Gas-to-gas heat exchanger (1225-E-0111), weighing 216 tons. Among them, the lifting of the reactor gas cooler drum (1225-V-0112) was the most technically challenging and complex aspect to coordinate in this operation. The device must be precisely placed on a specific base inside the frame; the space is limited and the paths are circuitous. Through precise calculations and simulations, the project team developed an innovative solution of \"lifting with two machines and pulling within the frame\": first, a 1600-ton crawler crane is used to lift it to the specified height at the edge of the frame. Subsequently, with the coordinated effort of 280-ton crawler cranes, a relay delivery process was carried out to smoothly transfer the equipment onto the specially prepared fixtures. Finally, the construction workers used multiple sets of large winches for precise pulling and adjustment; akin to threading a needle, they slowly moved this 120-ton \"giant\" onto the equipment foundation at a height of 18.15 meters, achieving placement with millimeter-level accuracy. The entire process is a model example of precise indoor installation of large-scale equipment.
Reply #22026-01-19
The lifting of the much-talked-about \"giant\" – the 1,063-ton reactor/gas cooler (1225-R-0110) – represented a comprehensive test of the project team’s organizational skills, technical expertise, and ability to handle emergencies. The equipment must be precisely aligned at a height of 20.85 meters; any minor deviation can lead to serious consequences. The project adopts the classic lifting method of \"a 1,600-ton crawler crane for main lifting and an 800-ton crawler crane for assisting lifting\". Introduction to the Jintang New Materials Project
Construction unit: Rongsheng New Materials (Zhoushan) Co., Ltd.
Construction location: Jintang Island, Dinghai District, Zhoushan City
Total investment: 76 billion yuan

Construction contents: Construction of new production facilities including a 600,000-ton/year propane dehydrogenation unit, a 3 million tons/year catalytic cracking unit, a 1 million tons/year gas separation unit, a 600,000-ton/year aromatic extraction complex, a 300,000-ton/year PEO production unit, a 1 million tons/year EVA complex, a 200,000-ton/year POE production unit, 400,000/250,000-ton/year phenol production units, a 200,000-ton/year 1,3-propanediol production unit, 400,000/880,000-ton/year PO/SM production units, a 400,000-ton/year PTT production unit, a 500,000-ton/year isobutane normalization unit, a 600,000-ton/year maleic anhydride production unit, a 500,000-ton/year BDO production unit, a 200,000-ton/year PBS production unit, a 400,000-ton/year PBT production unit, a 120,000-ton/year isobutylene production unit, a 180,000-ton/year butene oxidation dehydrogenation unit, a 150,000-ton/year CO₂ recovery unit, a 160,000-ton/year ethoxylation unit, a 200,000-ton/year DMC production unit, a 480,000-ton/year polyether polyol production unit, a 1.2 million tons/year ABS production unit, 2×240,000-ton/year bisphenol A production units, 2×260,000-ton/year polycarbonate production units, a 100,000-ton/year CHDM production unit, a 100,000-ton/year PCT production unit, a 100,000-ton/year PCTG production unit, a 50,000-ton/year UHMWPE production unit, 2×450,000-ton/year PP production units, a 300,000-ton/year α-olefin production unit, a 600,000-ton/year polyurethane elastomer production unit, a 140,000 standard cubic meters/hour coal-to-hydrogen production unit, and 2×20,000-ton/year sulfuric acid production units.
Reply #32026-01-19
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2025 to 2035, the first industrial control system in the petrochemical industry, with 100% domestically produced software and hardware, was successfully put into use in complex petrochemical plants. https://bbs.hcbbs.com/thread-5711442-1-1.html (Source: Haimen Chemical Industry Forum (HCBBS))
Reply #42026-01-20
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #52026-01-21
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2029 to 2026, CNOOC Engineering’s first intelligent acoustic imaging inspection system was put into use for high-pressure airtightness testing of the process pipelines at Shell’s project in Nigeria. https://bbs.hcbbs.com/thread-5711490-1-1.html (Source: Hachuan Chemical Industry Forum (HCBBS))
Reply #62026-01-21
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2021 to 2026, Guoneng Group’s project on \"Research on Key Technologies for Converting Desalinated Brine into Salt and Development of Pilot-Scale Equipment\" was successful in producing salt. https://bbs.hcbbs.com/thread-5711638-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72026-01-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2021 to 2026, Guoneng Group’s project on \"Research on Key Technologies for Converting Desalinated Brine into Salt and Development of Pilot-Scale Equipment\" was successful in producing salt. https://bbs.hcbbs.com/thread-5711638-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82026-01-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】Breakthrough achieved in China’s first offshore membrane carbon removal demonstration project: the associated gas recovery, carbon removal, and carbon dioxide sequestration project at the Huizhou 32-5 platform, 2982-2026 https://bbs.hcbbs.com/thread-5711847-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.