【Ten Years of Rapid Development in Chemical Equipment】Wanhua Chemical’s 2,063-ton propylene distillation tower from 2012 to 2023

2023-07-22View Original

Thread Content

This post was last edited by Desert Fish on 2023-7-22 at 19:46. Ten years of rapid development in chemical technology – let’s celebrate the prosperity and strength of modern China. This is just a starting point; more participation from everyone will make things even more lively. Haichuan becomes even better with your involvement; we welcome everyone to engage more in discussions on this forum. Be careful with fire as the heat increases in July. --------------------------------------------On July 15, 2023, the first batch of products from the 1.2 million tons per year ethylene and related high-end polyolefin production project in Wanhua’s Yantai industrial park, which was constructed by Hailu Heavy Industry, were delivered – specifically, towers No. 1 and No. 2 for propylene distillation. The completion of these large-scale towers for Wanhua Chemical represents a milestone for Hailu Heavy Industry. The No. 1 and No. 2 propylene distillation towers delivered this time are core static equipment for the ethylene plant; among them, the No. 2 propylene distillation tower was the first piece of equipment to be lifted for the ethylene project. This tower has an inner diameter of 9.4 meters, a wall thickness of 72 millimeters, and a length of 99.75 meters, with a net weight of 2,063 tons upon shipment. At the beginning of the project, to ensure the smooth progress of on-site construction, Wanhua’s progress control team worked together with the Marine & Land Containers division to make reasonable arrangements and meticulous plans, thereby formulating the optimal production strategy. Ultimately, while ensuring quality, the product delivery task was successfully completed 15 days ahead of schedule. Units 1 and 2 of the propylene distillation towers for this project were delivered ahead of schedule, which effectively ensured the timely completion of the project’s milestones and marked the beginning of the construction of Wanhua’s second-phase large ethylene project.
Reply #22023-07-22
【Ten Years of Rapid Development in Chemical Processing Equipment】320,000-ton single-point mooring equipment for China’s Ravi Ravi project in Indonesia, 2018–2023 https://bbs.hcbbs.com/thread-4389658-1-1.html (Source: Haichuan Chemical Industry Forum Website)
Reply #32023-07-22
It’s a large company, haha
Reply #42023-07-23
For such a large overall tower structure, in the past it was only possible to assemble the sections on the ground at the construction site first, then fit them together and weld them in the air, after which a full-scale scaffold had to be set up, along with platform ladders as well as pipelines, lighting systems, and insulation components – and it would take more than half a year to complete the construction.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.