Total investment of 9.86 billion yuan! Major changes in the Yulin coal chemical project of Shaanxi Yanchang Petroleum

2026-01-28View Original

Thread Content

On January 23, 2026, the Shaanxi Provincial Department of Ecology and Environment issued a public notice regarding the acceptance status of the environmental impact assessment documents for the Yulin coal-based ethanol and acetic acid downstream products project (major changes). Shaanxi Yanchang Petroleum Yulin Coal Chemical Co., Ltd. was established in November 2008. It is a wholly-owned enterprise funded by Shaanxi Yanchang Petroleum (Group) Co., Ltd. Since its establishment, the company has built a methanol production facility with an annual capacity of 200,000 tons, acetic acid production facilities with an annual capacity of 400,000 tons along with related equipment, a CO2 liquefaction facility with an annual capacity of 250,000 tons, a demonstration project for producing oil from syngas with an annual capacity of 150,000 tons, and a facility for the deep processing of heavy fractions derived from Fischer-Tropsch processes with an annual capacity of 30,000 tons. At present, the deep-processing facility for heavy fractions of 30,000 tons per year of Fischer-Tropsch products has been built but not yet completed with final acceptance; all other facilities have gone through the necessary environmental protection procedures and have been put into operation. The current production capacity is 200,000 tons per year of methanol (used to produce downstream products such as acetic acid), 400,000 tons per year of acetic acid, 150,000 tons per year of oil products, and 250,000 tons per year of carbon dioxide. Due to changes in market demand, the project owner optimized the downstream processing routes. While keeping the 300,000-ton vinyl acetate production facility unchanged, the 200,000-ton/year acetate ester facility and the 200,000-ton/year EVA facility were transformed into facilities for producing 30,000 tons/year of ultra-high molecular weight polyethylene, 50,000 tons/year of vinyl oil, 50,000 tons/year of alpha-olefins, and 100,000 tons/year of polyolefin elastomers. The revised project was re-registered with the Yulin Administrative Approval Service Bureau on January 24, 2025 (project code: 2206-610836-04-01-293862). Yulin Coal Chemical Ethanol Acetic Acid Downstream Products Project (Material Change): Nature of the project construction: Renovation and expansion. Location: The production facilities and associated infrastructure are located in plot C17, on the south side of Yuma Avenue, in the southern area of the coal chemical industry zone within the Yuheng Industrial Park; the shift workers’ dormitories and canteens are located in area C13. Construction contents: Construction of a 300,000-ton/year vinyl acetate plant, a 50,000-ton/year vinyl oil plant, a 30,000-ton/year ultra-high molecular weight polyethylene plant, a 50,000-ton/year alpha-olefin plant, and a 100,000-ton/year polyolefin elastomer (POE) plant, along with supporting utility systems, auxiliary production facilities, infrastructure in the area in front of the factory, shift worker dormitories, etc. Project investment: The total investment for this project is 9,859,954,900 yuan, of which 2,751,400,000 yuan is allocated to environmental protection measures, accounting for approximately 2.79% of the total project investment. Number of employees: 750 new positions to be added. Working system: The working system is four shifts and three rotations, with 333 days (8,000 hours) of work per year.
Reply #22026-01-29
【Ten Years of Rapid Development in Chemical Equipment】Successful First Commissioning of High-Pressure Carbon Dioxide Compressors for CCS Units at Shaanxi Gas Group from 2023 to 2026 https://bbs.hcbbs.com/thread-5712362-1-1.html (Source: Haichuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Reply #32026-01-30
【Ten Years of Rapid Development in Chemical Equipment】2996-2026 – Amazing! ! The CNPC First Construction Team completed the welding of the first weld on the diagnostic shielding module for the International Thermonuclear Fusion Experimental Reactor ITER project. https://bbs.hcbbs.com/thread-5712416-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #42026-01-30
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2997 to 2026: Domestic high-performance carbon fiber ZA55GC enters the core supply chain of domestic commercial aircraft https://bbs.hcbbs.com/thread-5712466-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #52026-01-30
【Ten Years of Rapid Development in Chemical Equipment】2998–2026: Independent technologies set numerous records! China’s largest purification plant for treating sulfur-containing natural gas passes performance assessment https://bbs.hcbbs.com/thread-5712474-1-1.html (Source: HCBBS Chemical Forum)
Reply #62026-01-30
【Ten Years of Rapid Development in Chemical Equipment】Key technologies for the efficient co-production of synthetic ammonia and LNG from smokeless pulverized coal, 2989–2026, have been approved for use. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5712191 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #72026-01-31
【Ten Years of Rapid Development in Chemical Equipment】2999–2026: Lunan Chemical’s world’s first 3,000-ton OMB coal gasification furnace has been operating continuously, safely and stably for over 350 days https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5712515 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #82026-01-31
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to participate in the discussion. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #92026-01-31
【Ten Years of Rapid Development in Chemical Equipment】The world’s first industrial production facility for the polyphase hydroformylation of ethylene using single-atom catalysts was put into operation between 2017 and 2020. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711445 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.