Thread Content
This post was last edited by Desert Fish on 2024-4-12 at 10:02. 2024: A time of blooming flowers and joy on the forum **********************【Ten Years of Progress in Chemical Processing Equipment】 – An ongoing compilation thread; feel free to join the discussions: https://bbs.hcbbs.com/thread-3576046-1-1.html (Source: Haichuan Chemical Engineering Forum) ***************** At around 9 a.m. on April 9, 2024, Shangdu provided eight sets of large-scale compression units with two lines and four stages for the world’s first 300-megawatt-class compressed air energy storage power station – the 300-megawatt-class compressed air energy storage demonstration project in Yingcheng, Hubei. All of these units passed their initial tests successfully and were connected to the grid without issues. It has set 3 world records in terms of single-unit power, energy storage capacity, and conversion efficiency, as well as achieved 6 industry demonstrations; there are also dozens of international firsts and global breakthroughs. This project utilizes a globally pioneering, fully green, non-supplementary-combustion, high-efficiency 300MW-class compressed air energy storage technology. It is currently the only large-scale, long-duration physical energy storage technology that can compete with pumped hydro storage, and is regarded as a \"stabilizer\" and a \"super power bank\" for the new power system. Included in the **third batch of lists of major technical equipment of the first kind in the energy sector**, the compression energy storage core equipment provided by Shaanxi Blower Group for this project was recognized as one of the \"Top 10 Scientific and Technological Innovations in the Energy Industry in 2023\". Since the project began, the SHANGGU team has pursued rapid and efficient progress in its construction while ensuring quality and safety, thereby guaranteeing that the project gets off to a strong start, operates efficiently, and is carried out to a high standard. Everyone has remained at the forefront, carrying out meticulous project management. Detailed project execution plans were developed in accordance with user requirements, and various plans were established, including project communication and coordination plans, project construction management plans, project document control regulations, project schedule control plans, and project quality management plans, all aimed at ensuring orderly organization and efficient oversight throughout the project’s implementation process.