Thread Content
Gansu Dier’s 200,000-ton molten salt project to be established in Guazhou 2025-12-10 11:12 · Yunshang Jiuquan. The annual production capacity of Gansu Dier’s molten salt plant will be 200,000 tons, with a total investment of 740 million yuan; the project will be built in two phases. Among them, the first phase involves the construction of a 100,000-ton potassium nitrate plant for molten salt use, which is expected to be completed and put into operation by the end of this year ; In the second phase, a production line for 100,000 tons of sodium nitrate and a production line for 100,000 tons of nitric acid will be built, along with a 200,000-ton molten salt mixing facility. The project utilizes self-developed molten salt energy storage technology; once fully operational, it will fill the gap in new energy storage materials in the northwest region, provide critical material support for concentrated solar power generation, enable the local production of key raw materials, and expand the “concentrated solar +” industrial chain in Guazhou County. This will help to increase the scale and quality of concentrated solar power projects while reducing costs and improving efficiency. Once the project is completed and put into operation, it is expected to generate an annual output value of 1 billion yuan and create more than 200 job opportunities.
【Ten Years of Rapid Development in Chemical Equipment】From 2887 to 2025: The world’s first project for producing anhydrous ethanol via biofermentation using 50,000 tons per year of syngas successfully yielded high-quality anhydrous ethanol and biological proteins. https://bbs.hcbbs.com/thread-5707547-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The submarine pipeline stability analysis software developed independently by CNOOC Engineering, 2862-2025, has obtained certification from the China Classification Society, filling a gap in this area. https://bbs.hcbbs.com/thread-5706988-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to participate in the discussion. https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2888-2025: Dongfang Electric’s floating wind power hydrogen production platform receives the world’s first approval certificate https://bbs.hcbbs.com/thread-5707552-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】For the first time in China, a full-scale venting test for 10-megapascal high-pressure hydrogen pipelines was successfully carried out from 2893 to 2025. https://bbs.hcbbs.com/thread-5707979-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】From 2887 to 2025: The world’s first project for producing anhydrous ethanol via biofermentation using 50,000 tons per year of syngas successfully yielded high-quality anhydrous ethanol and biological proteins. https://bbs.hcbbs.com/thread-5707547-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The “second-generation high-efficiency, low-energy urea synthesis process technology” with completely independent intellectual property rights, ranging from 2890 to 2025, has reached an internationally leading level in terms of overall technology. https://bbs.hcbbs.com/thread-5707669-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2892–2025: The world’s first 630°C secondary reheating thermal power project – The bypass system for the 2×1000MW ultra-supercritical secondary reheating steam turbines at Datang Yuncheng. Link: 289 https://bbs.hcbbs.com/thread-5707850-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】For the first time in China, a full-scale venting test for 10-megapascal high-pressure hydrogen pipelines was successfully carried out from 2893 to 2025. https://bbs.hcbbs.com/thread-5707979-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】2894-2025: SIC Heavy Industries Builds the World’s Largest and Heaviest EO Reactor https://bbs.hcbbs.com/thread-5708001-1-1.html (Source: Haichuan Chemical Forum (HCBBS))