Thread Content
Happy May Day 2024! Safety first. Let’s give praise and support to the achievements made in China’s chemical engineering technology and equipment. **********************[A Decade of Progress in Chemical Engineering Equipment] Regular updates and summaries are available; feel free to join the discussions at https://bbs.hcbbs.com/thread-3576046-1-1.html (Source: Haichuan Chemical Industry Forum Website) ***************** The Tianjin Scientific Testing Base of Sinopec’s North Chemical Research Institute is located adjacent to the Tianjin Petrochemical Plant. It is planned to be built in two phases; the first phase will focus on the construction of a polyolefin pilot plant, which will include 10 sets of polyolefin polymerization pilot units, 3 sets of polyolefin catalyst pilot units, and 1 set of special elastomer pilot units; The second phase of construction includes a Chemical Process Intensification Center, an Ethylene Technology Center, a Fine Chemicals Technology Center, an Environmental Protection Technology Center, and others. On April 30, 2021, the Tianjin scientific testing base of Sinopec Beijing Research Institute of Chemical Technology (referred to as “Beijing Research Institute”) held a groundbreaking ceremony in Binhai New Area. From May 14 to 15, 2024, the Engineering Department of Sinopec Group, in conjunction with the Health, Safety and Environment Management Department, the Science and Technology Department, the Materials and Equipment Department, and the Chemicals Business Unit, organized an intermediate handover and acceptance review for the Tianjin scientific testing base project of the Beijing Research Institute of Chemical Technology. Units such as the Beijing Research Institute of Chemical Technology, the project construction company, the Fourth Construction Company, and the Yangzi Petrochemical Supervision Company participated in this process. Fifteen experts from units such as the Tianjin branch, Luoyang branch, Zhongtian Hechuang Company, Zhenhai Refining and Chemical Company, and the Catalysts Branch were divided into four groups – focusing on safety and environmental protection, process technology, equipment, and instrumentation – to conduct the acceptance review. This led to the preparation of the \"Interim Completion Acceptance Review Report for the Beijing Research Institute of Chemical Technology’s Tianjin Scientific Testing Base Project.\" Professional, accurate, and timely review comments were provided regarding the project; it was concluded that the physical conditions at the Tianjin Scientific Testing Base were satisfactory, and the site was basically ready for trial operation. Moving forward, it is necessary to follow the overall trial operation plan and research priorities, adhere to the requirements related to improving safety management, uphold the standards and limits related to safety and quality, clarify responsibilities among all parties involved, strengthen on-site safety management, and enhance control over operational risks. The principle of \"no construction or operation if it is not safe\" should be strictly followed to ensure steady progress in the trial operation process. Beihua University Tianjin Science and Testing Base is located adjacent to the Tianjin Petrochemical Plant complex. It is planned to be built in two phases; the first phase will focus on the construction of a polyolefin pilot plant, which will include 10 sets of polyolefin polymerization pilot units, 3 sets of polyolefin catalyst pilot units, and 1 set of special elastomer pilot units ; The second phase of construction includes a Chemical Process Intensification Center, an Ethylene Technology Center, a Fine Chemicals Technology Center, an Environmental Protection Technology Center, and others. On April 30, 2021, the Tianjin scientific testing base of Sinopec Beijing Research Institute of Chemical Technology (referred to as “Beijing Research Institute”) held a groundbreaking ceremony in Binhai New Area.