The “Fupeng Furnace” for the gasification unit in Jinfeng Lünneng’s green hydrogen-based 500,000-ton green methanol production project (with an initial capacity of 250,000 tons) has been successfully lifted into place

2025-04-17View Original

Thread Content

On April 15, 2025, the gasifier for JinFeng Green Energy’s project to produce 500,000 tons of green methanol via green hydrogen (with an initial capacity of 250,000 tons) was successfully installed. This gasifier is a type of \"Fupeng furnace\" designed specifically for biomass gasification, and its technology comes from Beijing Qingchuang Jinhua Technology. The Fupeng furnace gasification technology represents the world’s first large-scale high-pressure fluidized-bed biomass gasifier, with a gasification pressure of 3.0 MPaG and a total gas output of 70,000 Nm3/h (CO + H2). Just one such gasifier is sufficient to meet the demand for producing 250,000 tons of methanol per year. The gasification section of this project is under the overall supervision of Hualu Engineering Technology Co., Ltd.; the handover certificate for the intermediate stages of the project is expected to be issued on June 20, 2025, with commissioning taking place on June 30. To better develop and promote the \"Fupeng Furnace\" gasification technology, Beijing Qingchuang Jinhua Technology established a subsidiary, Beijing Fupeng Technology Co., Ltd.
Reply #22025-04-17
On December 24, 2024, the Xingan League Ecology and Environment Bureau issued a announcement regarding the decision on the approval of the environmental impact assessment document for the \"Jinfeng Green Energy Chemicals (Xingan League) Co., Ltd. Project to Produce 500,000 tons of green methanol (with an initial capacity of 250,000 tons)\". The project is located in the Economic and Technological Development Zone of Xingan League, Inner Mongolia Autonomous Region, with geographical coordinates of 122.342806° east longitude and 45.996194° north latitude. The total area of the factory complex is 682,245 m2, with the first phase covering an area of 235,640 m2. The project involves the construction of 2 new biomass pellet production lines, 2 biomass gasification units, 1 desulfurization and decarbonization unit, 1 methanol synthesis unit, 1 methanol distillation unit, as well as various supporting infrastructure; the annual production capacity is 250,000 tons of methanol. The total investment amounts to 2,200 million yuan, of which 37.01 million yuan is allocated to environmental protection measures, accounting for approximately 1.68% of the total investment. On October 23, 2024, the Xingan League Ecology and Environment Bureau issued a public notice regarding the acceptance status of the environmental impact assessment documents for Jinfeng Green Energy Chemicals (Xingan League) Co., Ltd.’s project to produce 500,000 tons of green methanol, with an initial capacity of 250,000 tons. Project Name: Jinfeng Green Energy Chemicals (Xingan League) Co., Ltd.’s Project to Produce 500,000 tons of green methanol using green hydrogen (Phase 1: 250,000 tons)
Location of Construction: Xingan League Economic and Technological Development Zone, Inner Mongolia Autonomous Region
Constructor: Jinfeng Green Energy Chemicals (Xingan League) Co., Ltd.
Total Investment: The total investment amounts to 2,200,000 million yuan, of which 37,010,000 yuan is allocated to environmental protection measures. Construction plan: Production is expected to begin in October 2025. On April 18, 2024, the 500,000-ton green methanol production project involving wind power integration developed by Goldwind Science & Technology in Xingan League commenced construction. In December of the same year, the boiler for the project’s auxiliary works (EPC) was successfully ignited on the first attempt.
Reply #32025-04-18
【Ten Years of Rapid Development in Chemical Equipment】First domestic composite-zone gasification furnace put into operation from 2023 to 2025 https://bbs.hcbbs.com/thread-5691321-1-1.html (Source: Haichuan Chemical Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.