Thread Content
Total investment of 41 billion yuan! Construction of Phase 1 of Gansu Juhua’s New Material Integration Project Begins 2025-04-30 At 10:18 on April 28, the commencement ceremony for Phase 1 of Gansu Juhua’s high-performance silicon-fluorine new material integration project was held. Leaders from Gansu Juhua Fluorination Division, Jilin Mengxi Supervision Company, Zhejiang Engineering Design Co., Ltd., and other parties, along with our company’s project manager, attended the commencement ceremony. Manager Qi Feng from Gansu Juhua Fluorination Department, Manager Ma Honglin from Jilin Mengxi Supervision Company, Manager Mao Xuejun from Zhejiang Engineering Design Co., Ltd., and other leaders from the various parties involved in the project expressed their warm congratulations and high expectations. They hoped that all parties would work closely together to ensure that the project is completed to high standards and on time. Project manager Wang Xiaohong spoke: First, achieve zero safety incidents by strictly adhering to the safety guidelines for chemical industry construction, and ensure the safety of personnel, equipment, and the environment ; II. Strive for excellence in quality, and meticulously create high-quality projects that meet **standards and industry norms ; III. Strict control over the project timeline, with progress made in strict accordance with the plan to ensure the project is completed on schedule. The scope of work for Bid Section 1 of Gansu Juhua’s high-performance silicon-fluorine new material integration project mainly includes three main units: an anhydrous hydrogen fluoride unit equipped with a dual-reaction system, the HCC-240 unit, and the PCE unit. This project not only includes core process systems such as fluorite drying and reactive distillation, but also features advanced facilities such as exhaust gas treatment systems, finished product storage areas, refrigeration stations, intelligent power distribution systems, and cabinet rooms, fully reflecting the principles of intelligence and environmental sustainability in its design. This project presents certain challenges in terms of construction methods and scale. In the face of these challenges, all employees of the project team will work together, overcome difficulties, and strive to reach new heights, turning these challenges into opportunities. This will ensure that the project is completed safely, efficiently, and successfully, thereby contributing to **western development**. It is understood that the total investment for this project amounts to 410,465.5 million yuan. The project aims to build facilities with an annual production capacity of 360,000 tons of industrial silicon, 100,000 tons of polysilicon, 50,000 tons of trichlorosilane, 125,000 tons of fluoropolymers (including 10,000 tons of fluororubber, 10,000 tons of FEP, 50,000 tons of PTFE, 0.5 tons of PFA, and 50,000 tons of PVDF), 29,000 tons of HFP, 20,000 tons of pentafluoropropane (R245eb), 30,000 tons of HCC-240 (R240), 80,000 tons of R152a (HFC-152a), 120,000 tons of R142b (HCFC-142b), 70,000 tons of VDF, 120,000 tons of tetrachloroethane, 30,000 tons of tetrachloroethylene, 195,000 tons of R22, and 105,000 tons of TFE ; Supporting facilities will be built to produce 760,000 tons per year of methane chlorides (chloromethane: 360,000 tons, dichloromethane: 130,000 tons, trichloromethane: 270,000 tons), 150,000 tons of AHF, 300,000 tons of calcium chloride, 300,000 tons of sulfuric acid, 240,000 tons of calcium carbide, and 900,000 tons of ion-exchange membrane caustic soda (using waste salt generated in the integrated utilization project), along with related equipment. According to available information, Gansu Juhua New Materials Co., Ltd. was established on March 15, 2023, with its registered address in Yumen City, Jiuquan City, Gansu Province. It is a second-level wholly-owned subsidiary of the Juhua Group. On April 9, 165 key project management professionals from Zhejiang Juhua Group traveled 2,700 kilometers to Yumen City, marking a new phase in the comprehensive construction of Gansu Juhua New Materials Co., Ltd.’s high-performance silicon-fluorine new materials integration project, whose total investment exceeds 41 billion yuan. On March 3, the groundbreaking ceremony was held for the earthwork grading project of the high-performance silicofluorine new materials integrated project at Gansu Juhua New Materials Co., Ltd., which is being constructed by the East China Branch of Sinochem Second Construction Company. Leaders from the Management Committee of the old Yumen urban area attended the ceremony as representatives of the local government. The commencement of this project marks the full entry of the entire project into the construction phase.