HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Jingjiang Special Steel’s near-zero carbon electric furnace paired with a 10 million Nm3/year biogas project

2025-07-08View Original

Thread Content

Recently, the results of the tender for preparing the environmental impact assessment report for Jingjiang Biomass Natural Gas Project by Guanglu Smart Energy (Jingjiang) Co., Ltd. were made public. Winner of the bid: Jiangsu Environmental Protection Industry Technology Research Institute Co., Ltd. Project Overview:
Developer: Guanglu Smart Energy (Jingjiang) Co., Ltd.
Location: No. 23 Xingang Avenue, Jingjiang City, Taizhou Province, Jiangsu Province.
Land area: Approximately 86 mu, including land reserved for Phase II (as indicated by the red line map).
Project name: Jingjiang Special Steel’s Near-Zero Carbon Emission Electric Furnace Supporting Bionatural Gas Project.
Nature of the project: New construction project.
The Jingjiang Special Steel’s Near-Zero Carbon Emission Electric Furnace Supporting Bionatural Gas Project uses livestock and poultry manure, wheat straw, and rice straw as raw materials to produce bionatural gas through a dry-high-temperature anaerobic fermentation process, with an output capacity of not less than 10 million Nm3 per year ; Biogas is transported using Jingjiang Special Steel’s existing pipeline framework and connected to the designated consumption points ; Zero wastewater discharge ; Land for Phase II is reserved. Biogas production facilities involve all the processes required from the arrival of raw materials such as manure and straw at the facility, up to the production of biogas and organic fertilizer that meet specified standards. These processes include, but are not limited to, raw material preprocessing (including pre-treatment of manure and straw), dry high-temperature anaerobic fermentation, biogas storage, biogas purification (dehydration and desulfurization), biogas compression, biogas decarburization, solid-liquid separation, and the comprehensive utilization of the CO2 emitted during decarburization. March 2025, Hong Kong — China Everbright Green Environmental Protection Co., Ltd. (\"Everbright Green Environmental Protection\" or \"the Company\") (Stock Code: 1257.HK) announced a partnership with CITIC Pacific Special Steel Jingjiang Special Steel Co., Ltd. (\\"Jingjiang Special Steel\"), formally signing the \"Cooperation Agreement on the Bio-natural Gas Project for Electric Furnaces with Near-zero Carbon Emissions at Jingjiang Special Steel\". This project aims to provide green natural gas for Jingjiang Special Steel’s products through advanced technologies for the value-added utilization of biomass, thereby helping the company to establish China’s first near-zero carbon green metallurgy industry chain and achieve a low-carbon transformation. It also represents a significant breakthrough by Everbright Green Environmental Protection in the field of value-added utilization of biomass. This project is located in the Jingjiang Development Zone of Taizhou City, Jiangsu Province. The total investment in the project is approximately 60 million yuan, and it covers an area of about 80 mu. Its designed capacity is to produce 10 million cubic meters of green natural gas per year; it can also process around 50,000 tons of biomass per year, thereby reducing carbon emissions by about 12,000 tons. The project adopts high-temperature multi-material anaerobic fermentation technology as its core process, combined with advanced techniques such as dry desulfurization, chemical decarbonization, and advanced dehydration, to ultimately supply gas through a pipeline network, ensuring the efficient and clean use of energy. As a model project in the field of biomass energy, its successful implementation will help Everbright Green Environmental Protection further expand the market for high-value utilization of biomass, while also providing a model for supporting facilities needed for the green transformation of the traditional metallurgy industry.
Reply #22025-07-09
From Shenyang to Jianyang: the Sichuan air compression plant that eventually disappeared https://bbs.hcbbs.com/thread-5696530-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #32025-07-09
【Ten Years of Rapid Development in Chemical Equipment】First domestic implementation of tripartite cooperation 2517-2025 for green ethanol wet-process co-production of green methanol https://bbs.hcbbs.com/thread-5696538-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-07-10
【Ten Years of Rapid Development in Chemical Equipment】2520–2025: Fighting Rust! ! Baosteel develops \"Danxia Steel®\" weathering steel to ensure the stability of desert photovoltaic mounting structures https://bbs.hcbbs.com/thread-5696575-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-07-10
【Haichuan Teahouse】What makes Luzhou Zhangba longans different? https://bbs.hcbbs.com/thread-5696585-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-07-11
【Ten Years of Rapid Development in Chemical Equipment】2527-2025: Jieyang Dongyue Chemical’s world’s first industrial-scale facility for the deep pyrolysis of 200,000 tons per year of mixed plastic waste has achieved successful trial production. https://bbs.hcbbs.com/thread-5696666-1-1.html (Source: Haichuan Chemical Forum)
Reply #72025-07-14
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first 100% domestically produced 40 MPa high-pressure centrifugal compressor has been installed at the Yaha gas storage facility in the Tarim Oil Field. https://bbs.hcbbs.com/thread-5696760-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-07-14
【Ten Years of Rapid Development in Chemical Equipment】From 2030 to 2025, Hangyang’s 110,000-unit air separation unit has operated steadily for over 4,800 hours at the world’s largest coal-based olefins project! https://bbs.hcbbs.com/thread-5696765-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-07-17
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2538 to 2025! My first comprehensive test of a high-power integrated compressor was successful. https://bbs.hcbbs.com/thread-5696920-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-07-17
【Ten Years of Rapid Development in Chemical Equipment】The high-temperature concentrated sulfuric acid submersible pump produced by Kunming Jiahe Technology, from 2040 to 2025, was included in the \"Catalogue of Advanced Processes, Technologies, and Equipment for the Transformation and Upgrading of the Petrochemical Industry (2025 Edition)\". https://bbs.hcbbs.com/thread-5696931-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #112025-07-18
【Haichuan: Lessons from Others】Utilize new technologies to build intelligent water management platforms and reduce leaks! https://bbs.hcbbs.com/thread-5697023-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.