Thread Content
Announcement of the winner for the EPC contract for Xinjiang’s 240,000 Nm³/h hydrogen production project – 2025-07-24. On July 16, the China Tendering and Bidding Joint Platform issued the \"Result Announcement for the Green Energy-based Hydrogen Production Project (Phase I) at the Ganchimaozu Port Industrial Park, operated by Guomeng Hydrogen Energy Technology (Bayannur) Co., Ltd.\" This tender is divided into two lots; Lot 1 involves the general contracting of the project, and the winner is China State Construction Seventh Engineering Bureau Co., Ltd. (lead contractor) (consortium members: China Northwest Municipal Engineering Design and Research Institute Co., Ltd., Gansu China State Construction Municipal Engineering Survey and Design Institute) ; Section 2 is responsible for the supervision of this project, and the winning bidder is Sichuan Yuanfeng Construction Project Management Co., Ltd. It is understood that the green energy hydrogen production project (Phase 1) in the Ganchimao Du Port Processing Park of Guomeng Hydrogen Energy Technology (Bayannur) Co., Ltd. was registered on June 4, and an invitation for bids for EPC general contracting and supervision services was issued on June 20. The project is located in Wulat Middle Banner, Bayannur City. With a total investment of 5.65 billion yuan, construction is scheduled to begin in August this year and be completed by February 2027. The project plans to build a renewable hydrogen production, storage, and transportation facility with a capacity of 240,000 Nm³/h (resulting in an annual hydrogen output of 120,000 tons) and a hydrogen storage capacity of 300 tons. Now, with the announcement of the winning bids for EPC and supervision services, it means that the project is one step closer to official commencement. According to Tianyancha, Guomeng Hydrogen Energy Technology (Bayannur) Co., Ltd. was established on December 3, 2024, and is located in Bayannur City, Inner Mongolia Autonomous Region. It is a company that operates primarily in the field of electricity and heat production and supply. The registered capital of the company is 100 million RMB.
【Ten Years of Rapid Development in Chemical Processing Equipment】2025–2055: Pioneering the use of green ammonia as a replacement for traditional fossil fuels; the world’s first refueling operation using green ammonia as marine fuel was successfully completed. https://bbs.hcbbs.com/thread-5697473-1-1.html (Source: Haichuan Chemical Industry Forum)
【History of Haichuan Chemical】Welding pioneer Pan Jiluan and the establishment of welding programs in Chinese universities https://bbs.hcbbs.com/thread-5697433-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest solid hydrogen storage project, 2570-2025, was successfully put into operation as part of the Daan integrated demonstration project for producing green hydrogen from wind and solar energy for ammonia synthesis. https://bbs.hcbbs.com/thread-5697592-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2025 to 2035, significant breakthroughs have been achieved in China’s ultra-low temperature equipment; the country’s first 120-cubic-meter fixed-type ultra-low temperature storage tank was developed. https://bbs.hcbbs.com/thread-5697597-1-1.html (Source: Haichuan Chemical Industry Forum)
26 kilometers in ten days! The first large-scale key equipment for Maoming Petrochemical’s refinery transformation and upgrading project, namely Column 1 for propylene production, has arrived at the site. https://bbs.hcbbs.com/thread-5697633-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Great Development in Chemical Engineering Equipment】Significant innovations have been made in circulating fluidized bed combustion technology between 2025 and 2574. The \"technology for large-scale carbon reduction treatment of coal gangue with extremely low calorific value and low-activity fly ash from gasification\" can be found at https://bbs.hcbbs.com/thread-5697723-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2577 to 2025! The DN2200 large-diameter, extra-large and extra-long spray-coated wrapped insulation pipe has been successfully produced https://bbs.hcbbs.com/thread-5697762-1-1.html (Source: Haichuan Chemical Industry Forum)
【History of Haichuan Chemical】The Birth of China’s First Large-Scale Modern Alcohol Plant https://bbs.hcbbs.com/thread-5697868-1-1.html (Source: Haichuan Chemical Forum)
【History of Haichuan Chemical】The Birth of China’s First Large-Scale Modern Alcohol Plant https://bbs.hcbbs.com/thread-5697868-1-1.html (Source: Haichuan Chemical Forum)