Zhangzhou Gulei Port Construction and Development Group Co., Ltd.’s 100,000 tons/year biodegradable PLA/PBAT materials project

2025-08-19View Original

Thread Content

Project Name: 100,000-ton/year Biodegradable PLA/PBAT Materials Project by Zhangzhou Gulei Port Construction and Development Group Co., Ltd.
Launch Date: August 19, 2025
Location: Fujian Province
Industry/Project Type: Chemicals and Pharmaceuticals/Chemical Raw Materials and Chemical Products/Synthetic Materials
Project Owner: Zhangzhou Gulei Port Construction and Development Group Co., Ltd.
Total Investment: 280 million yuan
Current Progress: Project registration completed
Construction Location: Xilin Village and Gangkou Village, Gulei Town, Gulei Economic Development Zone, Zhangzhou City, Fujian Province
Project Scope: Construction of a facility capable of producing 100,000 tons per year of biodegradable PLA/PBAT materials, along with production workshops, raw material warehouses, a research and development center, and environmental protection facilities. The total land area is approximately 227.81 mu. Progress milestone: August 18, 2025 – The project registration was completed in June. (Project Filing)
Reply #22025-08-19
【Ten Years of Rapid Development in Chemical Equipment】By 2025, China will have established the world’s largest production base for polyurethane chain extenders. https://bbs.hcbbs.com/thread-5698998-1-1.html (Source: Haichuan Chemical Forum)
Reply #32025-08-19
【Ten Years of Rapid Development in Chemical Engineering Equipment】2623-2025: Advanced Technologies for Removing Hardness and Improving Efficiency in Coal Chemical Industry Wastewater, developed by the Sinopec Research Institute of Petrochemistry https://bbs.hcbbs.com/thread-5698913-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-08-20
【Ten Years of Rapid Development in Chemical Equipment】A 40,000-ton/year EPDM production plant using fully proprietary technology from 2625 to 2025 – with a complete operational process in place. https://bbs.hcbbs.com/thread-5699099-1-1.html (Source: Haichuan Chemical Forum)
Reply #52025-08-20
【Ten Years of Rapid Development in Chemical Equipment】A 40,000-ton/year EPDM production plant using fully proprietary technology from 2625 to 2025 – with a complete operational process in place. https://bbs.hcbbs.com/thread-5699099-1-1.html (Source: Haichuan Chemical Forum)
Reply #62025-08-20
【Ten Years of Rapid Development in Chemical Equipment】A 40,000-ton/year EPDM production plant using fully proprietary technology from 2625 to 2025 – with a complete operational process in place. https://bbs.hcbbs.com/thread-5699099-1-1.html (Source: Haichuan Chemical Forum)
Reply #72025-08-21
【Ten Years of Rapid Development in Chemical Engineering Equipment】2629-2025: China’s First Intelligent Painting Line for Offshore Oil and Gas Equipment Put into Use https://bbs.hcbbs.com/thread-5699156-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-08-22
【Ten Years of Rapid Development in Chemical Processing Equipment】The core equipment for the world’s first 1,000-ton pilot plant for green hydrogen-based aviation fuel was successfully installed between 2030 and 2025. https://bbs.hcbbs.com/thread-5699223-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-08-22
【Ten Years of Rapid Development in Chemical Engineering Equipment】2631-2025: High-altitude welding robots made in Chengdu with steel structures https://bbs.hcbbs.com/thread-5699236-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-08-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first offshore power station equipped with a weather radar in China was installed at the 800-megawatt offshore wind project in Dafeng, Jiangsu, from 2632 to 2025. https://bbs.hcbbs.com/thread-5699296-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #112025-08-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first offshore power station equipped with a weather radar in China was installed at the 800-megawatt offshore wind project in Dafeng, Jiangsu, from 2632 to 2025. https://bbs.hcbbs.com/thread-5699296-1-1.html (Source: Haichuan Chemical Engineering Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.