Thread Content
On August 22, the hydrogen and alcohol production component of the Junzhan Horqin Left Middle Banner integrated project for wind power, energy storage, hydrogen production, and alcohol synthesis was registered. Project owner: Junzhan Energy Technology (Tongliao) Co., Ltd ; Construction location: Baolongshan Chemical Industry Park, Industrial Park, Middle Left Wing of Horqin, Tongliao City ; Total investment: 900,000 million yuan ; Planned construction period: May 2026 to April 2030 ; Construction scale and scope: The project covers a total area of 1,350 mu. It adopts a technology route that utilizes wind and solar power to produce hydrogen, which is then used to manufacture green methanol. For hydrogen production, a new electrolysis unit with a capacity of 350,000 Nm³/h will be built; for green methanol production, two methanol synthesis units will be installed, along with biomass gasification furnaces, methanol distillation units, utility and auxiliary systems, biomass waste heat power generation units, as well as comprehensive office buildings, dining and dormitory buildings, laboratory buildings, and warehouses. The project is constructed in two phases: Phase 1 will enable an annual production of 550,000 tons of green methanol, and Phase 2 will also enable an annual production of 550,000 tons of green methanol, resulting in an overall annual production capacity of 1.1 million tons of green methanol.
【The Defunct Fertilizer Plant】Hefei Jianghuai Fertilizer Factory, which changed its name over time: https://bbs.hcbbs.com/thread-5699429-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】2633-2025: Jilin Petrochemical’s world’s first million-ton-scale diesel adsorption separation unit was successfully commissioned on its first attempt https://bbs.hcbbs.com/thread-5699500-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2634 to 2025! Sinopec’s biojet fuel (SAF) production technology receives its first international license https://bbs.hcbbs.com/thread-5699610-1-1.html (Source: Haichuan Chemicals Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2635–2025: China’s Self-constructed Largest Tonnage and Largest Gas Storage Capacity New Marine Floating Natural Gas Liquefaction Facilities https://bbs.hcbbs.com/thread-5699787-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2640–2025: Qingdao Institute of Energy’s “Biomass Dual Fluidized Bed Chemical Chain Gasification Technology” passes the scientific and technological achievement evaluation https://bbs.hcbbs.com/thread-5699948-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2643–2025: China Becomes the First Country in the World to Achieve Large-Scale Thermal Recovery of Heavy Oil at Sea ** https://bbs.hcbbs.com/thread-5700272-1-1.html (Source: Haichuan Chemical Industry Forum)