Fuzhou New Area Hydrogen Energy Industry Demonstration Park Construction Project

2025-09-08View Original

Thread Content

Project Name: Fuzhou New Area Hydrogen Energy Industry Demonstration Park Construction Project
Launch Date: September 5, 2025
Region: Fujian
Industry/Project Type: Power/Thermal Power/Cogeneration; Municipal facilities/gas and heat supply/cogeneration project. Owner: Changle District Industrial Investment Energy Co., Ltd., Fuzhou. Total investment: 2,058.97 million yuan. Current progress: Project registration completed. Location of construction: Changle District, Fuzhou City, Fujian Province. Scope of construction: 1. Hydrogen fuel cell production line: capable of producing 50,000 stack systems per year, along with a research and development laboratory for membrane electrodes ; 2. Hydrogen station network: 8 hydrogen stations will be installed in urban areas, ports, and on highways, offering integrated refueling options for oil, hydrogen, and electricity ; 3. Hydrogen-powered ship R&D base: Develop 500-ton class hydrogen-fueled inland ships, and build testing docks and a hydrogen production and storage technology center. Advance simultaneously the hydrogen-powered bus demonstration line and distributed cogeneration projects to establish a comprehensive demonstration system covering production, storage, transportation, and utilization. Progress milestone: 2025-09-04. The project approval item is code assignment. (Project Filing)
Reply #22025-09-09
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2660 to 2025, self-developed 10-kilowatt oscillating water column wave energy generation device “Dongbo-1” has reached a leading level in China. https://bbs.hcbbs.com/thread-5700863-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #32025-09-10
【Ten Years of Rapid Development in Chemical Equipment】China Petrochemical’s first fully domestically produced Safety Instrumented System (SIS) was successfully tested and approved in Hangzhou from 2021 to 2025. https://bbs.hcbbs.com/thread-5700967-1-1.html (Source: Haichuan Chemical Forum)
Reply #42025-09-12
【Ten Years of Rapid Development in Chemical Engineering Equipment】2665-2025: China’s aerospace-related semi-fixed-bed gasification units have achieved a continuous operation time of 2 years, breaking the world record for continuous operation using fluidized-bed gasification technology. https://bbs.hcbbs.com/thread-5701080-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #52025-09-12
【History of Haichuan Chemical】Permanent shutdown of the facilities at Huayi Group’s Shanghai Nenghua Wujing plant https://bbs.hcbbs.com/thread-5701106-1-1.html (Source: Haichuan Chemical Forum)
Reply #62025-09-15
【History of Haichuan Chemical】The crude oil pretreatment and catalytic cracking units at Yangzhou Petrochemical, which had been in operation for 32 years, were officially shut down and dismantled https://bbs.hcbbs.com/thread-5700372-1-1.html (Source: Haichuan Chemical Forum)
Reply #72025-09-15
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2679 to 2025: Development of the world’s first DN700 swirl vortex flowmeter, breaking the monopoly on high-end flowmeters. https://bbs.hcbbs.com/thread-5701235-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #82025-09-15
【Ten Years of Rapid Development in Chemical Engineering Equipment】Successful hydrogen production from gas field produced water from 2680 to 2025; the application areas of Dongfu Research Institute’s seawater hydrogen production technology continue to expand. https://bbs.hcbbs.com/thread-5701249-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-09-15
【Ten Years of Rapid Development in Chemical Equipment】From 2681 to 2025: China successfully installed 1.8 million tons per year of ethylene plant cracking gas compressors developed independently https://bbs.hcbbs.com/thread-5701251-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-09-15
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first offshore wind project with fully embedded rock foundations, 2682-2025, withstood the impact of a typhoon of level 17 without any damage https://bbs.hcbbs.com/thread-5701254-1-1.html (Source: Haichuan Chemical Engineering Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.