Thread Content
Gansu Junrui Wuwei Liangzhou New Energy Large-Scale Green Hydrogen Production Project: This project is located at No. 6-1, Changxing Road, South Area of Liangzhou Industrial Park, Yongchang Town, Liangzhou District, Wuwei City, Gansu Province. It was invested and constructed by Gansu Junrui Wei Yi Energy Co., Ltd. A project for producing 20,000 tons of hydrogen per year through electrolysis for renewable energy power generation in off-grid mode is being constructed; the total land area is 560,126.4 square meters, the total building area is 240,422 square meters, the area covered by paved roads is 165,096 square meters, and there are 56 sets of electrolysis equipment for hydrogen production ; The building complex includes: the plant area for electrolytic hydrogen production, the substation and cabinet rooms, high-pressure hydrogen storage tanks, the compression and transport area, the equipment for loading and unloading vehicles, the warehouse area, the office building serving as a control center, as well as fire pumps and fire ponds. The total investment for the project is 1,750 million yuan.
【Ten Years of Rapid Development in Chemical Equipment】2683-2025: SHENGU’s First Low-Temperature Ethylene BOG Reciprocating Compressor Completes Ultra-Low Temperature Load Testing https://bbs.hcbbs.com/thread-5701341-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】New breakthroughs have been achieved in the pre-oxidation technology for the carbon fiber industry between 2026 and 2025; China’s first pilot-scale pre-oxidation furnace utilizing a combination of hot air and microwave technologies with a width of 0.4 meters has been developed. https://bbs.hcbbs.com/thread-5701002-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The country’s largest \"linear Fresnel\" photothermal integrated energy demonstration project, 2687-2025, has achieved full-capacity grid connection for power generation. https://bbs.hcbbs.com/thread-5701500-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】2689-2025: Filling gaps in the domestic market; Sinopec releases its 60K large-tow carbon fiber product. https://bbs.hcbbs.com/thread-5701543-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】2690-2025: New grades of \"liquid EPDM\" produced by Jilin Petrochemical in China, filling a gap in the domestic market https://bbs.hcbbs.com/thread-5701549-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2694-2025: CNOOC Successfully Overcomes World-Class Challenges in Developing Offshore Limestone Oil Fields https://bbs.hcbbs.com/thread-5701679-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2694-2025: CNOOC Successfully Overcomes World-Class Challenges in Developing Offshore Limestone Oil Fields https://bbs.hcbbs.com/thread-5701679-1-1.html (Source: Haichuan Chemical Industry Forum)
【Haichuan Expands Horizons】Amazing! Xinjiang launches its largest floating wind turbine, with a capacity of 1.2 megawatts https://bbs.hcbbs.com/thread-5701700-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first hydrogen-ammonia dual-fuel gas turbine was successfully produced in the Yuanbaoshan Industrial Park in Chifeng, Inner Mongolia, from 2695 to 2025. https://bbs.hcbbs.com/thread-5701680-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】New breakthroughs achieved in the research and development of liquid hydrogen production equipment in China from 2026 to 2025 https://bbs.hcbbs.com/thread-5701766-1-1.html (Source: Haichuan Chemical Industry Forum)