Thread Content
On September 23, information from the Online Approval Service Hall for Investment Projects in Inner Mongolia Autonomous Region showed that the industrial project registration (for development and reform purposes) application submitted by Jinfeng Runhang New Energy Technology Co., Ltd. for Jinfeng Technology’s integrated wind and solar hydrogen production project in Wulat Middle Banner (the hydrogen, ammonia, and alcohol production section) was approved. Construction location: Bayannur City -- Wulat Middle Banner -- Ganqimaodu Port Processing Park, north of Zhongaxi Road, east of Jingwu Road, west of Jingqi Road, and south of Shenhua Park. Total investment: 968,261.58 million yuan, of which self-funded amount is 290,478.5 million yuan, bank loans applied for amount to 677,783.08 million yuan, and 0 million yuan from other sources. Planned construction period: from June 2026 to June 2029. Construction scale and scope: The project will include the construction of hydrogen production facilities using electrolysis, biomass gasification units, purification systems, and green ammonia production facilities. The total area of buildings in the factory will be 575,272.7 square meters. The factory area is divided into functional zones, including the area in front of the factory, auxiliary areas, hydrogen production area, ammonia synthesis area, and green methanol production area. The project is constructed in two phases; the first phase aims to achieve an annual production capacity of 600,000 tons of methanol ; The second phase of construction will enable an annual production of 400,000 tons of synthetic ammonia. On September 10, Goldwind Science & Technology issued a announcement stating that it held the fifth meeting of its ninth board of directors, during which the resolution regarding the signing of an investment agreement for Goldwind’s 3GW wind-hydrogen-ammonia-alcohol integrated project in Ulaat Middle Banner and the initiation of the corresponding application process was approved. The company intends to sign a Project Investment and Development Agreement for the wind power-based hydrogen, ammonia, and alcohol production project with the People’s Government of Bayannur City. It plans to invest in the construction of such a project within the jurisdiction of Bayannur City, with a total investment amount of approximately 18.92 billion RMB. Construction details: The overall plan for this project is to build 3 GW of wind power capacity. Over 80% of the electricity generated will be used for water electrolysis to produce green hydrogen; meanwhile, through biomass gasification combined with green hydrogen, 600,000 tons of green methanol and 400,000 tons of green ammonia will be produced annually.
【Ten Years of Rapid Development in Chemical Engineering Equipment】2702-2025: Aerospace Changzheng’s self-developed \"Integrated Gas Flow Bed High-Efficiency Conversion Technology for the Carbonization, Pulverization, and Gasification of Aerospace Biomass\" released https://bbs.hcbbs.com/thread-5701844-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2702-2025: Aerospace Changzheng’s self-developed \"Integrated Gas Flow Bed High-Efficiency Conversion Technology for the Carbonization, Pulverization, and Gasification of Aerospace Biomass\" released https://bbs.hcbbs.com/thread-5701844-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Haichuan Teahouse】You are welcome to join! ! ! The leisure section for National Day and Mid-Autumn Festival keeps costing money! ! ! ! https://bbs.hcbbs.com/thread-5702022-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 2705-2025 Research and Demonstration Project on Key Technologies for Large-Scale Advanced Electrical Energy Storage – the 50 megawatt/100 megawatt-hour digital energy storage demonstration project – has passed the acceptance assessment. https://bbs.hcbbs.com/thread-5701879-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】By 2025, the total length of submarine oil and gas pipelines in China will exceed 10,000 kilometers. https://bbs.hcbbs.com/thread-5702037-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Haichuan Explores the World】What is a sand battery? https://bbs.hcbbs.com/thread-5702064-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The heavy oil catalytic cracking (RTC) technology developed independently by the Shih Chien Institute from 2008 to 2025 converts low-quality heavy oil, which has a large volume but high costs, into light olefins. https://bbs.hcbbs.com/thread-5701894-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】World’s largest group of forging and rolling equipment with the greatest diameter put into operation in Jinan from 2027 to 2025 https://bbs.hcbbs.com/thread-5701911-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】International Leadership in Revolutionary Technologies for Dehydration via Coupled Reactions of Solid Materials 2698-2025 https://bbs.hcbbs.com/thread-5701768-1-1.html (Source: Haichuan Chemical Industry Forum)
【Haichuan National Day Spending Bonus Reward Wealth】The two festivals are here – have you set out today?» https://bbs.hcbbs.com/thread-5702164-1-1.html (Source: Haichuan Chemical Industry Forum)