Thread Content
On January 10, at the construction site of the Blue Sea New Materials project undertaken by the company, a large crawler crane lifted the butylene refining tower – the first key process equipment for the POE facility – smoothly and precisely to its designated location. This marks the full commencement of the equipment installation work for this project, pushing the overall construction into a critical phase. On January 12, the dehexane tower was successfully lifted. The tower is 28.085 meters tall and weighs 21,625 kg; lifting was carried out using 400-ton and 320-ton crawler cranes in coordination. The butene refining tower that was installed earlier was 29.27 meters tall and weighed 19,730 kg; it is one of the key towers in the POE production facility, used primarily for the purification and separation of the butene component in the raw materials. The accuracy and quality of its installation have a direct impact on the stability of subsequent processing operations as well as the quality of the product. This lifting operation was carried out after thorough preparation and technical briefings; it progressed smoothly throughout, with the tower being placed in position successfully in one attempt, and the accuracy met all design requirements. As a key component of the strategic plan for the industrial development of high-end polyolefin elastomers (POE) in China, the Blue Ocean New Materials project holds great significance for enhancing the country’s capacity to develop new chemical materials independently. The precise installation of the butylene refining tower this time is not only an important milestone in the project construction but also highlights Liumian Company’s leading technical expertise and outstanding project management capabilities in the installation of large-scale chemical plants. The successful installation of the first core tower has not only provided systematic experience for the subsequent construction of mechanical and electrical equipment, but also laid a solid foundation for fully achieving the project’s mid-term goals.
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first 1,500-meter-class vertical pipeline underwater connector with metal sealing has been certified: 2972-2026 https://bbs.hcbbs.com/thread-5711122-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to participate in the discussion. https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2025 to 2036, the first industrial control system for the petrochemical industry, with 100% domestically produced software and hardware, was successfully put into use in complex petrochemical plants. https://bbs.hcbbs.com/thread-5711442-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】2978-2026: China’s First “Lighthouse Factory” in the Global Fiber Industry Established by Huafeng Chongqing Spandex https://bbs.hcbbs.com/thread-5711458-1-1.html (Source: Haichuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2026, CNOOC Engineering’s first intelligent acoustic imaging inspection system was put into use for high-pressure airtightness testing of the process pipelines at Shell’s project in Nigeria. https://bbs.hcbbs.com/thread-5711490-1-1.html (Source: Huchuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2026, CNOOC Engineering’s first intelligent acoustic imaging inspection system was put into use for high-pressure airtightness testing of the process pipelines at Shell’s project in Nigeria. https://bbs.hcbbs.com/thread-5711490-1-1.html (Source: Huchuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2021 to 2026, Guoneng Group’s project on \"Research on Key Technologies for Converting Desalinated Brine into Salt and Development of Pilot-Scale Facilities\" was successful in producing salt. https://bbs.hcbbs.com/thread-5711638-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))