Thread Content
Public announcement on the approval process for Hunan Fubang’s project to produce 10,000 tons of lithium bis(fluorosulfonylimide) per year – New Zoom Bang subsidiary. 2025-10-09 14:25:12. Recently, information regarding Hunan Fubang New Materials Co., Ltd.’s project to expand its production capacity to 10,000 tons of lithium bis(fluorosulfonylimide) per year was posted on relevant websites for approval purposes. Driven by advancements in manufacturing processes, as well as the need to reduce costs and better meet market demands and corporate strategic goals, Fubang Company plans to carry out renovations and expansions within its existing facility to build a plant capable of producing 10,000 tons of lithium bis(fluorosulfonylimide) per year. This project was approved for registration on October 18, 2024. Basic information on the project: Project name: Project for annual production of 10,000 tons of lithium bisfluorosulfonylimide. Nature of construction: Renovation and expansion. Constructor: Hunan Fubang New Materials Co., Ltd. Location of construction: Songmu Economic Development Zone, Hengyang, Hunan. Total investment: 223.183 million yuan. Construction details: (1) Build a production line for annual production of 10,000 tons of lithium bisfluorosulfonylimide, to be carried out in two phases. Phase 3.1 involves constructing a production line with an annual output of 3,000 tons of lithium bisfluorosulfonylimide along with its supporting facilities, while Phase 3.2 involves building a production line with an annual output of 7,000 tons of lithium bisfluorosulfonylimide and its supporting facilities ; “The production process and equipment for the 2,400 tons per year capacity of lithium difluorosulfonylimide, which have been established under the \"Project for the Expansion and Upgrade of Lithium Difluorosulfonylimide Production with an Annual Output of 4,000 tons\" (Heng Huan Fa No. 149), remain unchanged ; The construction of the equipment related to the 1,600 tons/year production capacity that has not yet been built will no longer proceed. (3) Demolish the existing 35m incinerator with a processing capacity of 0.8 t/h; all hazardous waste that was previously sent to this incinerator for disposal is now handed over to qualified entities for treatment. (4) Construct an 1100-meter-long, DN300 fiberglass-based overhead sulfur dioxide transmission line with a transport capacity of 11,000 tons per year (from Fubang to Hengguang), equipped with devices such as toxic gas alarms and transmission fans.
【Haichuan’s National Day Spending Spree】The long holiday is coming to an end – what local specialties are packed in the trunk? https://bbs.hcbbs.com/thread-5702601-1-1.html (Source: Haichuan Chemical Industry Forum)
【Haichuan’s Grand Spending for National Day】Good news. There are only 132 days left until the next major holiday, Spring Festival. https://bbs.hcbbs.com/thread-5702665-1-1.html (Source: Haichuan Chemical Industry Forum)
【Haichuan’s Grand Spending on National Day】On the first day back to work after the long holiday, full of energy! https://bbs.hcbbs.com/thread-5702678-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 2724-2025 Fuzhou City base, the first national **-level research, testing, and demonstration facility for offshore wind power, is expected to become operational this year. https://bbs.hcbbs.com/thread-5702507-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Great Development in Chemical Engineering Equipment】2025–2035: From Black Shackles to Green Building Materials – A Transformation of Coal-Based Solid Waste https://bbs.hcbbs.com/thread-5702535-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From Reliance on Imports to Global Leadership: 6 Years of Efforts to Develop Helium, the “Industrial Blood”, 2726–2025 https://bbs.hcbbs.com/thread-5702633-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From Reliance on Imports to Global Leadership: 6 Years of Efforts to Develop Helium, the “Industrial Blood”, 2726–2025 https://bbs.hcbbs.com/thread-5702633-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】2727–2025: High pressure to reach 10 MPa! Zhongneng Dayou has successfully developed a multi-field coupling testing device for hydrogen production using 100kW-class PEM electrolyzers. https://bbs.hcbbs.com/thread-5702702-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2027 to 2025, CNPC Pipeline Bureau successfully developed an intelligent anti-corrosion construction robot for storage tank exteriors. https://bbs.hcbbs.com/thread-5702707-1-1.html (Source: Haichuan Chemical Industry Forum)