Thread Content
. Introduction to the procurement project 1.1 Name of the procurement project: Reform project for treating the off-gases from the modified asphalt molding area at Shanxi Coking Co., Ltd. 1.2 Purchaser: Shanxi Coking Co., Ltd. 1.3 (Please log in) 1.4 Status of funding for procurement projects: Funded. 1.5 Overview of the procurement project: The three types of off-gases generated in the modified asphalt processing area are washed and absorbed by an exhaust gas cleaning tower; thereafter, they are pressurized using a fan and sent to the heating furnace of Reactor No. 1 in Modified Asphalt Line I, where they are burned before being released directly through the chimney. Since this approach does not meet environmental regulations, it is necessary to direct these off-gases to a tar distillation tubular furnace for combustion. 2. Scope of procurement and related requirements 2.1 Scope of procurement: This procurement project is divided into 1 bid section; the procurement in question relates to the three portions of off-gases generated in the modified asphalt processing area. These off-gases are washed and absorbed by an exhaust gas cleaning tower, after which they are pressurized using a fan and sent to the heating furnace of Reactor No. 1 in the old modified asphalt processing unit for incineration, with the resulting fumes being discharged directly through a chimney. Since this approach does not meet environmental standards, it is necessary to direct these off-gases to a tar distillation tubular furnace for combustion. This project mainly involves the fabrication and installation of equipment and pipelines for the off-gas treatment system in the modified asphalt molding area, anti-corrosion and insulation work, related civil engineering construction, electrical and instrumentation installations, as well as DCS configuration (see technical requirements for details). 2.2 Project duration: 90 calendar days. 2.3 Location of construction: The production area of Shanxi Coking Co., Ltd. in Mingjiang Town, Hongtong County, Shanxi Province. 2.4 Quality requirements: Must comply with the \"Unified Standards for Quality Inspection of Industrial Installation Projects\" and other current relevant national and industry standards for the quality inspection of construction projects. 3. Supplier Qualification Requirements 3.1 Supplier Qualification Requirements: Suppliers participating in the procurement activities for this project must be independent legal entities registered within the People’s Republic of China, holding valid business licenses. In addition, they must meet the following conditions: (1) Qualification requirements: The supplier must possess a general contracting qualification for mechanical and electrical engineering projects at level 3 or above, issued by the competent construction administration department. They must also have a valid “License for the Installation, Modification, and Repair of Special Equipment” (at level GC2 or above for pressure pipelines), or a “License for the Production of Special Equipment” (at level GC2 or above for pressure pipeline installation), along with a valid safety production license. (2) Project leader: The project manager to be assigned by the supplier should hold a professional qualification as a registered constructor with a level 2 or higher in mechanical and electrical engineering, as well as a valid safety production assessment certificate (Type B), and shall not be serving as a project manager for any other ongoing construction projects. (3) Financial requirements: None. (4) Performance requirements: None. (5) Other requirements: None. 3.2 Credit requirements: The supplier must not be listed by the administrative authorities for industry and commerce as a company with serious violations and dishonesty in the “**Enterprise Credit Information Publicity System**” (except for public institutions) ; The supplier is not listed on the \"Credit China\" website or the \"China Enforcement Information Website\" (zxgk.court.gov.cn) as a party that has violated its obligations, nor is it included in the list of entities with serious violations related to work safety (a screenshot or report showing the search results is required; if the screenshot is unclear, incorrect, or incomplete, the evaluation panel may conduct an on-site search) ; 3.3 The supplier shall not be in any of the following situations: (1) Having the same person in charge as another supplier involved in this project. (2) There is a direct controlling relationship with other suppliers of this project. (3) There is a management relationship with other suppliers of the project. (4) There have been the following serious adverse circumstances in business operations over the past three years: ① Being suspended, disqualified, or prohibited from participating in procurement activities by the industry regulatory authorities at or above the provincial level where this project is located, in accordance with the law. ②It is in a state where it has been ordered to suspend operations, have its license temporarily seized or revoked, its permit temporarily seized or revoked, or its qualification certificate revoked. ③Entering liquidation proceedings, being declared bankrupt, or encountering other circumstances that result in an inability to fulfill obligations. ④In accordance with the company’s supplier management requirements, those who are prohibited from participating in procurement activities and whose restrictions are still in effect. ⑤Those who have committed fraud to secure a deal, engaged in serious breaches of contract, or had significant quality issues with projects within the past three years. (5) Other prohibited circumstances: None. 3.4 Consortiums are not permitted to participate in the procurement process for this project. 4. Compensation for outcomes: No compensation will be provided to the suppliers whose bids were not successful for their economic or technical efforts invested in this procurement process. 5. Acquisition of procurement documents 5.1 Time of acquisition: from 18:00 on October 21, 2025, to 18:00 on October 26, 2025 (Beijing time).
【Ten Years of Rapid Development in Chemical Engineering Equipment】2742-2025: Historic Progress in China’s Exploration for Natural Hydrogen – The first scientific drilling well for natural hydrogen was drilled in Xilinhot, Inner Mongolia https://bbs.hcbbs.com/thread-5703031-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first alcohol-hydrogen electric ship sets sail in Shanghai from 2775 to 2025 https://bbs.hcbbs.com/thread-5703730-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first alcohol-hydrogen electric ship sets sail in Shanghai from 2775 to 2025 https://bbs.hcbbs.com/thread-5703730-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first alcohol-hydrogen electric ship sets sail in Shanghai from 2775 to 2025 https://bbs.hcbbs.com/thread-5703730-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first alcohol-hydrogen electric ship sets sail in Shanghai from 2775 to 2025 https://bbs.hcbbs.com/thread-5703730-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】2777-2025: China’s first 7,500-ton dual-fuel methanol refueling ship, the “Daqing 268”, was launched in Zhoushan https://bbs.hcbbs.com/thread-5703756-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】2778=By 2025, the energy capacity will be around 24,000 kWh; the world’s largest 10,000-ton pure-electric freight ship will be launched in Yi. https://bbs.hcbbs.com/thread-5703760-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2779 to 2025: Hycor Technology unveiled the world’s first 5MW PEM electrolyzer and hydrogen production system for offshore use. https://bbs.hcbbs.com/thread-5703809-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2027 to 2025, the electrochemical research institute has achieved international leadership in the technology of using high-alkali coal from Xinjiang in boiler combustion https://bbs.hcbbs.com/thread-5703883-1-1.html (Source: Haichuan Chemical Industry Forum)