HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Public announcement regarding the re-submission for environmental impact assessment of the Zhonghua Chemical Wuhuan Xiangyun Phosphorus-Fluorine New Materials project after adjustments

2025-11-04View Original

Thread Content

Recently, the Huanggang Municipal Department of Ecology and Environment issued a notice regarding the re-submission for approval of the environmental impact assessment for the Zhonghua Chemical Wuhuan Xiangyun Phosphorus-Fluorine New Materials project. The details of the project are as follows: In order to further reduce pollutant emissions and improve the comprehensive utilization of resources, changes were made during the construction of this project; the scale of some facilities was adjusted, the sequence of construction was altered, certain production processes were changed, and the layout plans as well as the scale of auxiliary facilities also changed. As a result, it is necessary to resubmit the environmental impact assessment documents for this project. The construction is to be approved again and carried out in two phases. Phase 1 of the construction includes 2×15,000 tons per year of anhydrous hydrogen fluoride production units (including 2×7,500 tons per year of units for the comprehensive utilization of fluorosilicate slag), 10,000 tons per year of electronic-grade hydrofluoric acid production units, and 2,000 tons per year of ultra-high molecular weight phosphorus polymer production units. Phase 2 includes 2×15,000 tons per year of anhydrous hydrogen fluoride production units (with an additional 2×7,500 tons per year of units for the comprehensive utilization of fluorosilicate slag), 10,000 tons per year of electronic-grade hydrofluoric acid, 10,000 tons per year of lithium bis(fluorosulfonylimide), 6,000 tons per year of electronic-grade ammonium fluoride, 50,000 tons per year of potassium fluoride, and 30,000 tons per year of ultra-high molecular weight phosphorus polymers. Project background: The total planned investment for this project is approximately 3.93 billion yuan. In June 2023, it received approval from the Huanggang Municipal Ecology and Environment Bureau, which authorized the construction of a facility capable of producing 50,000 tons per year of ultra-high molecular weight phosphorus polymers, 2 facilities capable of producing 30,000 tons per year each of anhydrous hydrogen fluoride, 2 facilities capable of producing 10,000 tons per year each of electronic-grade hydrofluoric acid, a facility capable of producing 6,000 tons per year of electronic-grade ammonium fluoride, a facility capable of producing 10,000 tons per year of lithium bis(fluorosulfonyl)imide, and (1+4) facilities capable of producing 10,000 tons per year each of potassium fluoride. The project is constructed in two phases; Phase 1 includes a 20,000-ton/year facility for ultra-high molecular weight phosphorus polymers, a 30,000-ton/year facility for anhydrous hydrogen fluoride, a 10,000-ton/year facility for electronic-grade hydrofluoric acid, a 10,000-ton/year facility for lithium bis(fluorosulfonylimide), and a 10,000-ton/year facility for potassium fluoride. Phase 2 includes a 30,000-ton/year ultra-high molecular weight phosphorus polymer plant, a 30,000-ton/year anhydrous hydrogen fluoride plant, a 10,000-ton/year electronic-grade hydrofluoric acid plant, a 0.6000-ton/year electronic-grade ammonium fluoride plant, and a 40,000-ton/year potassium fluoride plant.
Reply #22025-11-04
【Ten Years of Rapid Development in Chemical Processing Equipment】2795–2025: Filling a Gap in China’s Market – Boyun Bio’s High-Performance Chromatography Consumables Facility Now Operational in Tianjin https://bbs.hcbbs.com/thread-5704377-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #32025-11-05
【Ten Years of Rapid Development in Chemical Processing Equipment】2796-2025: Construction Management of Ethylene Process Piping Projects at Huanqiu Liujiàn’s Tarim Project Site – Completion of All Tasks https://bbs.hcbbs.com/thread-5704422-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-11-05
【Ten Years of Rapid Development in Chemical Processing Equipment】2797-2025: Guangxi Petrochemical’s world’s first variable-frequency drive system enables hot standby switching for compressors in electrically driven ethylene production units. https://bbs.hcbbs.com/thread-5704443-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-11-05
【HaiChuan Discussion】The client’s demands are getting higher and higher, while the prices kept being pressed lower. Can such work still pass the acceptance test? https://bbs.hcbbs.com/thread-5704576-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-11-06
【Ten Years of Rapid Development in Chemical Equipment】The first commercial ammonia-to-hydrogen production facility in China with a capacity of 1,000 kilograms was officially completed in Foshan between 2027 and 2025 – the Fuda Zijin facility. https://bbs.hcbbs.com/thread-5704478-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-11-06
【Ten Years of Rapid Development in Chemical Equipment】The core equipment for China’s first 400,000 tons/year LAO production facility – the high-purity C4 and C6 product towers – was accepted in Dalian. https://bbs.hcbbs.com/thread-5704530-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-11-06
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2800 to 2025: Kunming University of Science and Technology, in collaboration with Guangdong, developed China’s first mobile zero-carbon hydrogen production and power generation unit, which was showcased at the forum. https://bbs.hcbbs.com/thread-5704545-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-11-07
【Ten Years of Rapid Development in Chemical Processing Equipment】The largest domestic project of its kind for continuous polymerization on a scale of 5,000 tons per batch of para-aramid fibers was successfully put into operation between 2021 and 2025. https://bbs.hcbbs.com/thread-5704579-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-11-07
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first carbon dioxide + flywheel energy storage demonstration project was completed in Deyang, Sichuan, from 2003 to 2022. https://bbs.hcbbs.com/thread-5704593-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #112025-11-08
【Ten Years of Rapid Development in Chemical Engineering Equipment】Successful trial production of HE700M high-strength, extra-thick welded H-beams by Shansteel Co., Ltd. from 2024 to 2025 https://bbs.hcbbs.com/thread-5704594-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.