【Haichuan EPC】Audit risks and preventive measures for EPC completion settlement!

2025-11-16View Original

Thread Content

Under the EPC model, the final settlement audit is a crucial step in ensuring the proper use of project funds and safeguarding the quality and efficiency of the project. However, due to the integrated nature of design, procurement, and construction in the EPC model, the audit of final settlement faces numerous risks. This article will analyze these risks and propose corresponding preventive measures. Due to the characteristics of the EPC model, the final settlement audit under this approach entails certain unique audit risks, making it more complex compared to the traditional general contracting model for construction projects. The following are the main risk points in the EPC completion settlement audit: Specific audit risk point 1: Risk of misinterpretation and improper application of contract terms. Unclear definition of the contract scope: Is the scope of work specified in the EPC contract clear? Was the scope of work accurately determined at settlement? Is there any situation where work within the scope of the contract is treated as changes, or where work outside that scope is not properly included? Vague terms regarding changes and claims: EPC contracts usually have strict procedures for making changes. Do the terms clearly specify the triggers for changes, the approval procedures, and the pricing principles? Disputes may arise during audits over what constitutes an effective change. Dispute over price adjustment mechanism: Are the factors for price adjustment specified in the contract? Are adjustments made strictly in accordance with the agreement during implementation? Is there any abuse of the price adjustment clause? Performance assessment and fines: Was a performance assessment conducted? Do the assessment results meet the requirements of the contract? Were the performance penalties to be deducted fully accounted for in the settlement? Are the assessment data accurate and reliable? 2. Risks of design changes and optimizations: Confusion over design responsibilities: Under the EPC model, the general contractor is responsible for the design, and audits need to clarify this distinction. Owner-initiated change: A legitimate change resulting from changes in the owner’s requirements. General contractor’s optimization/deepening design: It is part of the contractual obligations and is usually not charged separately. Modifications caused by design errors/defects of the general contractor: This is the responsibility of the general contractor, and the associated costs should not be passed on to the owner. Necessity and relevance of the change: Is the proposed design change truly necessary? Is it directly related to the project objectives? Is there any situation where design flaws or poor cost control are concealed under the guise of changes? Insufficient basis for changing the pricing: Is the change in pricing based on the pricing principles stipulated in the contract? Are the documents supporting the change costs sufficient and accurate? 3. Risks related to the authenticity of the procurement process and costs: Related-party transactions and inflated prices: Does the general contractor use affiliated companies for procurement? Are the purchase prices fair and transparent? Is it significantly higher than the reasonable market level? Audits require in-depth examination of purchase contracts, invoices, payment vouchers, market quotations, etc. Management of materials supplied by the owner/designated brands: In the case of materials supplied by the owner or equipment of designated brands, are their quantity, quality, and timing of delivery in line with the requirements? Is the calculation of related storage and coordination costs reasonable? Is there any waste of materials supplied by the client due to the responsibilities of the general contractor? Difficulty in writing off equipment and materials: EPC projects involve a wide variety of equipment and materials; is the actual amount used consistent with the amounts specified in the design budget and the contract specifications? Is there any misreporting, fraud, or serious waste? Is the write-off system sound and effectively implemented? Treatment of tariffs/ VAT on imported equipment: Are the calculations, payments, and deductions of related taxes and fees in compliance with **regulations**? Are there any situations where responsibilities that should fall on the general contractor are instead passed on to the owner? 4. Measurement and approval risks during construction: Lack of documentation for concealed works and ongoing processes: EPC projects focus on the end results, so the documentation related to the construction process may not be as comprehensive as in traditional approaches. Are the acceptance records for concealed works and the video materials complete? Is the visa issued in a timely and proper manner? The credibility of information added afterwards is high. Visa validity dispute: Does the visa comply with the procedures specified in the contract? Did the visa-related matters actually occur, and are they outside the scope of the contract or require adjustment? Are there visa on favor or retroactive visas? Disputes over quantity measurement: For the portions to be settled based on actual quantities, are the criteria used for measuring and calculating those quantities sufficient and accurate? Auditing reviews are difficult. Reasonableness of idle time/construction acceleration costs: Are the claimed costs for idle time and construction acceleration indeed caused by the owner’s actions or by risk events specified in the contract? Is the basis for calculation reasonable? Is there inefficiency caused by problems in the general contractor’s own management? 5. Subcontracting management risks: Accuracy of subcontracting settlements – Are the settlement documents submitted by the main contractor accurate and complete? Have the subcontracted works been actually completed and are they of satisfactory quality? Is there any practice of inflating subcontracting costs to obtain funds? Scope of subcontracting and qualifications: Does the scope of professional subcontracting and labor subcontracting comply with legal regulations and contractual agreements? Are the subcontractor’s qualifications compliant? Is there any illegal sub-contracting or assignment? Subcontract price pass-through: Does the general contractor pass on unreasonable high subcontract prices to the owner? 6. Risks related to the completeness and compliance of as-built documents: As-built drawings/as-built documents: Do the as-built drawings accurately reflect the final completed state? Do the completion documents meet the requirements of specifications and the contract in terms of completeness, accuracy, and timeliness? Lack of information severely affects audit efficiency and conclusions. Completeness of acceptance procedures: Are the acceptance procedures at each stage complete and compliant? Is the acceptance report genuine and valid? Risk of open items under a fixed price: Although EPC involves a fixed price, the contract usually stipulates certain open items. The audit must strictly determine whether these openings are valid, and whether the resulting cost calculations are accurate and reasonable.
Reply #22025-11-16
Thoroughly understand the audit response strategies and key points as well as the contract: this is the foundation of EPC audits. It is essential to thoroughly understand all key terms such as the scope of the contract, the rights and obligations of both parties, the pricing structure, procedures for changes and claims, risk allocation, acceptance criteria, and breach of contract provisions. Pay attention to changes and claims: this is the main way to break through the fixed price. Thoroughly examine the reasons and responsible parties for each change/claim, as well as compliance with procedures, the basis and rationality of pricing, and the adequacy of supporting documents. Thorough verification of procurement costs: Conduct focused audits on key equipment and bulk materials, examining procurement contracts, bidding processes, invoices, payments, inventory movements, and usage amounts, while also performing price comparisons in the market. Strengthen on-site inspection and verification: Visually inspect the actual project structure, compare the as-built drawings with the physical structure, especially in areas involving concealed works, and verify the installation and operation status of equipment. Pay attention to the review of process-related documents: Examine project management logs, supervision logs, meeting minutes, correspondence, inspection records, etc., to reconstruct the project implementation process and verify the authenticity and background of settlement matters. Leverage professional expertise: For complex design changes, equipment performance, and special processes, seek professional judgment from experts in design, cost estimation, and equipment. Pay attention to the performance assessment results: carefully review the performance assessment reports to ensure that the assessment process is fair and the data is accurate, and use this information to deduct from or adjust the settlement amount. Strengthen audit of subcontract settlement: Conduct extended audits on subcontract projects with large amounts to verify the authenticity of subcontract costs. The core of the EPC completion settlement audit lies in upholding the principle of a fixed total price. The audit risks primarily relate to the clarity and enforcement of contract terms, the authenticity and rationality of design changes, the fairness of procurement costs, the accuracy of construction measurement, the standardization of subcontract management, and the completeness of process documentation. Auditors must possess a thorough understanding of contracts, specialized engineering knowledge, skills in cost auditing, and a keen ability to identify risks. By employing in-depth audit methods, they can effectively detect and address such risks, ensuring that the settlement results are accurate, lawful, and reasonable, thereby protecting the legitimate rights and interests of the client.
Reply #32025-11-16
【Ten Years of Rapid Development in Chemical Equipment】2823-2025: Zhejiang Xinhecheng becomes the third company in the world to master the technology for producing bio-based PPS products. https://bbs.hcbbs.com/thread-5705209-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-11-16
【Ten Years of Rapid Development in Chemical Engineering Equipment】2814-2020: Qingdao Institute of Energy became the world’s first institution to successfully commercialize a production process for 200,000 tons per year of second-generation biodiesel using liquid molecular catalysis technology. https://bbs.hcbbs.com/thread-5704915-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-11-17
【Common Issues in Haichuan Pipeline Design】Proper consideration should be given to the space required for equipment maintenance and the operation of valves. https://bbs.hcbbs.com/thread-5705460-1-1.html (Source: Haichuan Chemical Forum)
Reply #62025-11-17
【Great Article Sharing】The Decade-Long Gamble on \"Coal-to-Olefins\": What Have We Won, and What Have We Lost? https://bbs.hcbbs.com/thread-5705491-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-11-17
【Ten Years of Rapid Development in Chemical Processing Equipment】China’s largest \"carbon capture\" project: Successful trial injection of carbon dioxide in Yulin’s 4 million-ton capacity \"carbon capture\" project 28262025 https://bbs.hcbbs.com/thread-5705257-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-11-17
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2027 to 2025, the Wulanchabu \"integration of power generation, transmission, consumption, and storage\" test base operated by China Three Gorges Corporation successfully produced liquid hydrogen. https://bbs.hcbbs.com/thread-5705274-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-11-18
【Ten Years of Rapid Development in Chemical Processing Equipment】Delivery of the first modular submerged combustion vaporizer (SCV) unit in China that utilizes a floating storage and regasification unit (FSRU) from 2828 to 2025 https://bbs.hcbbs.com/thread-5705393-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-11-18
【Ten Years of Rapid Development in Chemical Engineering Equipment】China-made desalination modules for European methanol projects were officially delivered and shipped, 2829–2025 https://bbs.hcbbs.com/thread-5705395-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #112025-11-19
【Ten Years of Rapid Development in Chemical Engineering Equipment】Successful assembly of the DC converter transformer for the world’s first \"sea-land integrated\" flexible DC transmission project from 2025 to 2030 https://bbs.hcbbs.com/thread-5705493-1-1.html (Source: Haichuan Chemical Engineering Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.