Thread Content
On December 1, information available on the Online Approval Portal for Investment Projects in Inner Mongolia showed that the project submitted by Energy Group Hydrogen Technology Co., Ltd., namely the research and application of key technologies for the production, storage, transportation, and handling of liquid hydrogen, meets the industrial policy requirements and market access standards; therefore, its registration was approved. Construction location: Shengyuan Industrial Park, Mengsu Economic Development Zone, Yijinholo Banner, Ordos City – bounded to the east and south by the Shenhua Coal-to-Oil Plant area, to the north by the Yi-Wu Highway, and to the west by the Xiaoda Line. Total investment: 373 million yuan, of which 111.9 million yuan comes from own funds, 261.1 million yuan from bank loans, and 0 yuan from other sources. Planned construction period: from September 2026 to September 2028. Construction scale and scope: The plant will have a hydrogen purification capacity of 6,500 cubic meters per hour, as well as a hydrogen liquefaction capacity of 10 tons per day. Construction contents: Utilizing the blue hydrogen resources from the coal-to-oil project of the Ordos Coal-to-Oil Branch of China Shenhua Coal-to-Oil Chemical Co., Ltd. as raw materials, a pressure swing adsorption purification unit, a hydrogen liquefaction unit, liquid hydrogen storage tanks, gas and liquid hydrogen filling stations, water supply and drainage systems, power supply and distribution systems, gas supply systems, heating systems, and other auxiliary facilities will be constructed. Process flow: The raw material hydrogen is supplied by the upstream coal-to-oil project and enters the pressure swing adsorption purification unit of this project to produce high-purity hydrogen. Some high-purity hydrogen is pressurized by a compressor, filled, and transported. Part of the high-purity hydrogen enters a liquid nitrogen pre-cooling hydrogen liquefaction system, where it is cooled step by step to produce qualified liquid hydrogen, which is stored in liquid hydrogen storage tanks. Afterwards, it is transferred to liquid hydrogen tankers via a liquid hydrogen transfer system for transportation.
【Ten Years of Rapid Development in Chemical Equipment】2860-2035: Amazing! Lifting of the 220-meter-span, 3,600-ton dome grid structure in Asia’s largest \"fish-shaped\" water park – a steel structural grid system https://bbs.hcbbs.com/thread-5706919-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The submarine pipeline stability analysis software developed independently by CNOOC Engineering, 2862-2025, has obtained certification from the China Classification Society, filling a gap in this field. https://bbs.hcbbs.com/thread-5706988-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】After 13 years of trial production from 2863 to 2025, a breakthrough was achieved, breaking foreign monopolies! Successful trial production of 17-meter ultra-long ultra-high-pressure steel pipes in our country https://bbs.hcbbs.com/thread-5706989-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Great Development in Chemical Equipment】2865-2025: Turning Waste into Treasure! Shenzhen Institute’s 100-kilowatt oil and gas wastewater hydrogen production system converts wastewater into green hydrogen https://bbs.hcbbs.com/thread-5707067-1-1.html (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2867 to 2025, CNOOC Engineering took the lead in developing a device for detecting the bell mouth angle of cable-laying machines, which has been successfully put into use. https://bbs.hcbbs.com/thread-5707082-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2028 to 2025, Ansteel pursued the project aimed at achieving localization of steel catenary risers and related components for oil and gas exploration; the first batch of welded steel catenary riser products produced as part of this project were launched globally. https://bbs.hcbbs.com/thread-5707125-1-1.html (Source: HCBBS Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first ton-scale magnesium-based solid hydrogen storage and transportation system was successfully demonstrated in hydrogen metallurgy applications, 2869–2025. https://bbs.hcbbs.com/thread-5707130-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first ton-scale magnesium-based solid hydrogen storage and transportation system was successfully demonstrated in hydrogen metallurgy applications, 2869–2025. https://bbs.hcbbs.com/thread-5707130-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The first prefabricated module for the plant’s process pipeline system in CNPC’s Blue Ocean New Materials project (2028–2025) has been successfully shipped. https://bbs.hcbbs.com/thread-5707283-1-1.html (Source: HCBBS Chemical Forum)
【Sea and River Safety Discussion】Hidden Dangers Around Us – What is the difference between calibration and verification of four-in-one gas detection alarms? How should it be executed? https://bbs.hcbbs.com/thread-5707652-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))