Thread Content
Recently, the 400 kV substation of the Oman United Solar Polysilicon project, which was EPC-general contracted by China Energy Engineering Group Shanxi Electric Power Engineering Company, was successfully connected to the grid. This critical milestone provides a solid foundation for the commissioning and operation of the various production systems in the project, as well as for the full-scale supply of electricity. It marks a significant advancement in the construction of the Oman United Solar Polysilicon Plant, offering strong support for the commissioning and power supply of its various production systems in the future. The project is located deep in the Oman desert, where the natural environment at the construction site is extremely harsh; summer temperatures often exceed 50 degrees Celsius, posing serious challenges to construction planning, equipment calibration, and the work of the personnel involved. Faced with these challenges, the project team rose to the occasion by not only strictly adhering to the construction standards set by Oman’s **Oman Electric Transmission Company (OETC)** and efficiently deploying local resources, but also implementing thorough control over safety, quality, and progress throughout the entire process, ensuring that all key milestones were met on time and enabling the project to achieve its goal of achieving grid connection on schedule. According to public information, this polysilicon plant, with a total investment of $1.6 billion and an annual production capacity of 100,000 tons, has made rapid progress since its construction began in March 2024. By early 2025, the main structure and equipment installation were completed, and it is now in the final stages of equipment testing and pipeline connection. Industry experience shows that it usually takes 3–6 months to complete the comprehensive system testing after a substation is connected to the grid. Based on the latest progress of the project, official operation is expected to begin in the first quarter of 2026, which is a slight delay from the original target of the end of 2025; however, this is still within the normal construction timeline.
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】After 13 years of development, 2863-2025 was successfully developed, breaking foreign monopolies! Successful trial production of 17-meter ultra-long ultra-high-pressure steel pipes in our country https://bbs.hcbbs.com/thread-5706989-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】2865-2025: Turning Waste into Treasure! Shenzhen Institute’s 100-kilowatt oil and gas wastewater hydrogen production system converts wastewater into green hydrogen https://bbs.hcbbs.com/thread-5707067-1-1.html (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2867 to 2025, CNOOC Engineering took the lead in developing a device for detecting the flare angle of cable-laying machines, which has been successfully put into use. https://bbs.hcbbs.com/thread-5707082-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first ton-scale magnesium-based solid hydrogen storage and transportation system was successfully demonstrated in hydrogen metallurgy applications, 2869–2025. https://bbs.hcbbs.com/thread-5707130-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first ton-scale magnesium-based solid hydrogen storage and transportation system was successfully demonstrated in hydrogen metallurgy applications, 2869–2025. https://bbs.hcbbs.com/thread-5707130-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The first prefabricated module for the plant’s process pipeline system in CNPC’s Blue Ocean New Materials project (2028–2025) has been successfully shipped. https://bbs.hcbbs.com/thread-5707283-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The coal-based α-olefin-based technology for producing medium-low viscosity mPAO, independently developed by Guoneng Group, was successfully put into operation for the first time: https://bbs.hcbbs.com/thread-5707383-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The world’s first commercial project for producing hydrogen through water photolysis, 2884-2025, has been completed and put into operation in Panzhihua City. https://bbs.hcbbs.com/thread-5707404-1-1.html (Source: Haichuan Chemical Forum (HCBBS))