The list of key construction projects in Shaanxi Province for 2022 has been released! On April 29, the Shaanxi Provincial Development and Reform Commission officially released the list of key construction projects for 2022. According to the plan, in 2022, Shaanxi Province identified 620 key construction projects, of which 398 were ongoing projects and 222 were new projects started. These projects are mainly categorized into 10 groups. These include ecological protection and restoration projects, sewage treatment plants, and waste incineration for power generation, among other environmental protection initiatives. High-end Energy and Chemical Industry Development Projects (29) 180 Yulin: High-efficiency conversion of 10 million tons of coal per year into various products, as well as downstream processing of BDO in a circular economy framework 181 Yanchang Petroleum: Production of 500,000 tons of coal-based ethanol per year in Yushen 182 Xinfafa Shenmu Power Plant 183 Guoneng: Production of 50,000 tons of polyglycolic acid per year 184 Shenhua Guoneng Binchang: Demonstration project for 660MW ultra-supercritical CFB technology using low-calorific-value coal 185 Shaanxi Coal Yushen: Project for producing 1.8 million tons of ethylene glycol per year 186 Shaanxi Coal Yushen: Project for the pyrolysis-based utilization of coal at different quality levels 187 Zhen’an Pumped Storage Power Station 188 Yulin: Production of 500,000 tons of polymethoxymethane per year 189 Ankang Xunyang Hydropower Station 190 Yulin Longhua Coal Industry: Clean and efficient comprehensive utilization of coal at different quality levels 191 Yueneng: Production of 400,000 tons of ethylene glycol per year 192 Yulin: Industrial demonstration project for environmentally friendly innovative technologies related to the production of 600,000 tons of high-performance resins and related equipment 193 Balasu Coal Mine in the northern part of the Yuheng mining area 194 Dahaize Coal Mine in the northern part of the Yuheng mining area 195 Zhaoshipan Coal Mine in the southern part of the Yuheng mining area 196 Yanchang Petroleum Fuxian Power Plant 197 Yulin Shanxi Investment Qingshuichuan Power Plant (Phase III) 198 Datang Yan’an Fuxian Power Plant 199 Yulin Hongdunjie Power Plant 200 Yueneng Yanghuopan Power Plant 201 Diantou Power Plant in Huangling County 202 Wangfeng Coal Mine in Hancheng with a capacity of 3 million tons 203 Xizhuo Coal Mine in the Chenghe mining area 204 China Nuclear Chunhua Wind Power Plant in Xianyang 205 Comprehensive promotion of distributed photovoltaic power stations in Zhen’an County 206 New energy projects combining wind, solar, and storage in Hancheng 207 Yulin: Production of antioxidants and catalysts for olefins 208 Natural gas collection and transportation projects in the Yan694 and Yan653 oil fields in Yan’an
New high-end energy and chemical industry development projects (13) 104 Yulin Coal Valorization for the Production of New Chemical Materials (Phase I) Project 105 Yulin Baijiarui’s Annual Production of 1.2 million tons of formaldehyde and related products (Phase I) 106 Yuanyang’s Annual Production of 500,000 tons of chemicals via high-temperature Fischer-Tropsch process 107 Yulin’s chemical product manufacturing 108 Changqing Oil Field’s oil and gas exploration and development 110 Guaranteed grid connection by 2022 111 Shaanxi-Wuhan DC Line Phase I New Energy Base 112 Weinan City New Energy Base 113 Shenfu-Hebei South Grid New Energy Transmission Base 114 China National Coal Group’s Advanced Coal Processing in Yulin (Phase II) 115 Yueneng Yuheng’s 2×350MW combined heat and power plant 116 Huanghaojie Mine and coal processing plant
At 8:30 on February 21, the **50,000-ton/year polyglycolic acid demonstration project in Yulin, Shaanxi (hereinafter referred to as the “GYPGA” project), which is under the supervision of Luohua Group Company, launched its “100-Day Campaign” initiative. Wang Chi, the Party secretary and general manager of the company, was present to offer his congratulations and deliver a speech; he then worked with all employees of the project team to make detailed plans for the tasks to be carried out during this campaign period. image.png This “100-Day Campaign” marks the entry of the GYPGA project into a critical final phase. Luohua Group attaches great importance to it, and General Manager Wang Chi represents the company in providing full support for the construction of the GYPGA project. All members of the supervision team for the Yulin GYPGA project have also stated that they will live up to the company’s expectations, adhering to the service philosophy of “solving problems for the clients and ensuring the success of the project.” They pledge to fulfill their duties as third-party supervisors, strictly controlling the safety, quality, and progress of the project, ensuring proper implementation of supervision procedures, and fulfilling their responsibilities thoroughly. By focusing on preventive and ongoing control measures and implementing detailed management strategies, they aim to make continuous progress in the project’s development, so as to achieve full completion of the GYPGA project by June 30th, and thus make further contributions to the **Energy Group’s efforts to develop high-end coal chemical industries.
Yulin produces 500,000 tons of polymethoxymethane per year
Industrial demonstration project for environmental-friendly innovative technologies in the production of 600,000 tons per year of high-performance resins and related equipment in Yulin
Some of the names here are really fancy; just by looking at them, it’s impossible to tell what they are for – one has to do a search to find out
Doesn’t this project fail to meet the energy consumption standards? Approved?