Thread Content
Project Name: Construction Project for Annual Production of 150,000 Tons of Special Organic Silicon New Materials by Shandong Yuanzhongyuan New Energy Technology Co., Ltd. Date of Launch: December 04, 2025 Location: Shandong Industry/Project Type: Chemicals and Pharmaceuticals/Chemical Raw Materials and Chemical Products/Synthetic Materials; New infrastructure and new industries/New industries/New materials: Project owner – Shandong Yuanzhongyuan New Energy Technology Co., Ltd. Total investment: 1,000 million yuan. Current progress: Project registration completed. Location of construction: High-tech Zone, Liaocheng City, Shandong Province. Scope of construction: The project covers an area of approximately 100 mu. The project includes the construction of 2 silicone rubber production buildings, 1 silicone oil production building, 1 research and office building, 2 auxiliary buildings, as well as various supporting facilities. It also features 10 raw rubber production lines, 4 rubber compound production lines, 4 vinyl silicone oil production lines, 4 liquid adhesive production lines, and 4 modified silicone oil production lines. The raw materials required for production include DMC/D4, auxiliary materials such as hydroxy silicone oil, and silica gel. The equipment needed for production consists of a newly installed nitrogen-bubbling dehydration reactor (with semi-tube heat transfer oil), multi-stage dehydration condensers, a double-screw polymerization reactor (with semi-tube heat transfer oil), a device for removing low-molecular-weight substances from silicone oil, a condenser for removing low-molecular-weight substances from silicone rings, a semiconductor resin cooling unit, an alkali resin reactor, a mixing reactor, and vacuum molecular pump systems. The production process involves feeding materials in, filtering, dehydrating, polymerizing, breaking up the resulting mass, removing low-molecular-weight substances, discharging the product, and packaging it. Upon completion of the project, it will have an annual production capacity of 100,000 tons of adhesive, 20,000 tons of mixed rubber, 5,000 tons of vinyl silicone oil, 10,000 tons of liquid adhesive, and 15,000 tons of modified silicone oil. Progress milestone: December 03, 2025 – Project registration has been approved. (Project Filing)
【Ten Years of Rapid Development in Chemical Equipment】After 13 years of development, 2863-2025 was successfully developed, breaking foreign monopolies! Successful trial production of 17-meter ultra-long ultra-high-pressure steel pipes in our country https://bbs.hcbbs.com/thread-5706989-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】2865-2025: Turning Waste into Treasure! Shenzhen Institute’s 100-kilowatt oil and gas wastewater hydrogen production system turns wastewater into green hydrogen https://bbs.hcbbs.com/thread-5707067-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2867 to 2025, CNOOC Engineering took the lead in developing a device for detecting the bell mouth angle of cable-laying machines, which has been successfully put into use. https://bbs.hcbbs.com/thread-5707082-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first ton-scale magnesium-based solid hydrogen storage and transportation system was successfully demonstrated in hydrogen metallurgy applications from 2028 to 2025. https://bbs.hcbbs.com/thread-5707130-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】The first prefabricated module for the plant’s process pipeline system in CNPC’s Blue Ocean New Materials project (2028–2025) has been successfully shipped. https://bbs.hcbbs.com/thread-5707283-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】The first prefabricated module for the plant’s process pipeline system in CNPC’s Blue Ocean New Materials project (2028–2025) has been successfully shipped. https://bbs.hcbbs.com/thread-5707283-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The coal-based α-olefin-based technology for producing medium-low viscosity mPAO, independently developed by Guoneng Group, was successfully put into operation for the first time: https://bbs.hcbbs.com/thread-5707383-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The world’s first commercial project for producing hydrogen through water photolysis, 2884-2025, has been completed and put into operation in Panzhihua City. https://bbs.hcbbs.com/thread-5707404-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】From 2025 to 2035, Pingmei Shenma Hydrogen Chemistry Company successfully achieved the domestic substitution of spare parts for high-pressure coal slurry pumps used in gasification units. https://bbs.hcbbs.com/thread-5707406-1-1.html (Source: Huchuan Chemical Forum (Hua Hai Chuan Liu hcbbs))