Thread Content
Recently, the construction of the fire water tank in the northern area of the Shandong Xiajin Industrial Park project, undertaken by the Seventh Engineering Company of 14th Chemical Construction Group, was successfully completed. Since the start of construction, the project team has strictly adhered to the specifications for tank construction. From the inspection of raw materials upon arrival, to the flaw detection at each welding stage, and finally to the hydrostatic testing, every step has been subject to strict oversight under a \"real-name system\" to ensure zero risks to the safety and quality of the project. The achievement of this key milestone not only optimizes the layout of the fire protection piping system in the northern area of the project but also significantly enhances the emergency response capabilities at the construction site, providing a solid hardware foundation for safe production and the smooth progress of the project going forward.
【Haichuan Equipment Guessing Game】What type of structure is this being assembled? ? A watchtower? https://bbs.hcbbs.com/thread-5710149-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】The first domestic project for ethane recovery and co-production of LNG was completed at the Diniudi gas field in Yulin, 2949–2026. https://bbs.hcbbs.com/thread-5710164-1-1.html (Source: Hchuan Chemical Forum (Hchuanliu hcbbs))
【History of Haichuan Chemicals】The Engine of Civilization: A Thousand-Year Evolution of Pumps https://bbs.hcbbs.com/thread-5710250-1-1.html (Source: Haichuan Chemicals Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The world-leading technology for converting straw into green methanol has been put into use in Linquan County, from 2948 to 2025. https://bbs.hcbbs.com/thread-5710105-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2942-2025: China’s first domestically produced 300-megawatt-class heavy-duty gas turbine put into operation https://bbs.hcbbs.com/thread-5709928-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】From 2025 to 2035, China’s first green and intelligent production line capable of producing carbon nanotubes on a scale of 1,000 tons per year was put into operation successfully. https://bbs.hcbbs.com/thread-5710299-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】China Petrochemical’s first subcritical once-reheat unit was successfully commissioned between 2025 and 2952 https://bbs.hcbbs.com/thread-5710462-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The ammonia and hydrogen storage system at Qinghai Asia Silicon Poly Silicon Co., Ltd., a project supervised by Tianhua Institute from 2025 to 2035, was successfully commissioned in just one attempt. https://bbs.hcbbs.com/thread-5710544-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2025 to 2035, Chengdu Kene and other companies developed the world’s first megawatt-class fully liquid carbon dioxide energy storage system, which has been successfully put into operation for power generation. https://bbs.hcbbs.com/thread-5710545-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))