Hoisting of the syngas scrubber tower for the gasification unit in Inner Mongolia Zhuozheng Coal Chemical Project completed

2025-12-11View Original

Thread Content

The lifting of the syngas scrubbers for the gasification unit of the Inner Mongolia Zhuozheng Coal Chemical Project has been completed. Recently, the last two syngas scrubbers for this project’s gasification unit were lifted, marking the completion of all lifting tasks related to the large-scale equipment in that unit. Located in the Nalinhe Industrial Park of the Sulihe Economic Development Zone in Wushen Banner, Ordos City, Inner Mongolia, this project adheres to the industry guidance policies aimed at promoting green and low-carbon development as well as energy conservation and environmental protection. It primarily produces more than 30 types of primary and secondary products, including methanol, acetic acid, polyglycolic acid, and polyoxymethylene, all of which possess good biodegradability and biocompatibility. Once completed, the products manufactured will be widely used in various fields such as textiles, pharmaceuticals, agriculture, construction, polymer chemistry, and building engineering, thereby further promoting the diversification, low-carbon development, and advancement of the region’s energy economy.
Reply #22025-12-11
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32025-12-11
【Ten Years of Rapid Development in Chemical Equipment】From 2887 to 2025: The world’s first project for producing anhydrous ethanol via biofermentation using 50,000 tons per year of syngas successfully yielded high-quality anhydrous ethanol and biological proteins. https://bbs.hcbbs.com/thread-5707547-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42025-12-11
【Ten Years of Rapid Development in Chemical Processing Equipment】The first national \"5G+Industrial Internet\" smart coking system was put into operation in 2025 – a project with an annual production capacity of 3.6 million tons of compacted coke. https://bbs.hcbbs.com/thread-5706895-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-12-12
【Ten Years of Rapid Development in Chemical Equipment】The “second-generation high-efficiency, low-energy urea synthesis process technology” with fully independent intellectual property rights, ranging from 2890 to 2025, has reached an internationally leading level. https://bbs.hcbbs.com/thread-5707669-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62025-12-12
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #72025-12-13
【Ten Years of Rapid Development in Chemical Equipment】2894-2025: SIC Heavy Industries Builds the World’s Largest and Heaviest EO Reactor https://bbs.hcbbs.com/thread-5708001-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #82025-12-13
【Ten Years of Rapid Development in Chemical Engineering Equipment】2895-2025: The Sixth Academy of Aerospace Engineering built China’s first commercial liquid hydrogen refueling station, which was officially put into operation in Panzhihua. https://bbs.hcbbs.com/thread-5708004-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92025-12-14
【Ten Years of Rapid Development in Chemical Engineering Equipment】2896-2025: China’s first AI-based intelligent pipeline inspection model is put into industrial use at Bao Shi Pipeline Industry https://bbs.hcbbs.com/thread-5708019-1-1.html (Source: HaiChuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Reply #102025-12-14
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2870 to 2025! China’s first pilot production line for agglomeration using coal gangue on a scale of tens of millions of tons has been put into operation. https://bbs.hcbbs.com/thread-5707225-1-1.html (Source: HCBBS Chemical Forum)
Reply #112025-12-14
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first zero-carbon data center that utilizes pressure energy was officially put into use in Shaoxing, Zhejiang, from 2874 to 2025. https://bbs.hcbbs.com/thread-5707292-1-1.html (Source: HCBBS Chemical Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.