[Haichuan Overseas Engineering] The high-altitude removal and lifting of the regenerator head for the refinery maintenance project at Dangote Refinery in Nigeria was successfully completed

2025-12-24View Original

Thread Content

The high-altitude removal and lifting of the regenerator head at the Dangote Refinery was successfully completed on December 20. After 17 consecutive hours of hard work, day and night, the project team managed to remove the 1,350-ton heavy regenerator top head along with the cyclone separator components from a height of 60 meters, and install them accurately on a temporary repair framework. The completion of this key milestone marks a significant advancement in the regenerator repair project at the Dangote Refinery. This lifting operation presents numerous challenging tasks, including the welding and heat treatment of the head lugs, the removal of the refractory lining, the cutting of long and deep welds, as well as the lifting of 1,340-ton heavy components at great heights. For the head welds, which are up to 48 millimeters thick and 66 meters long, as well as the hard linings, the project team formed \"double-shift task forces\" to carry out 24/7 cleaning efforts, ensuring seamless progression of the work processes. Furthermore, the team innovatively adopted a \"suspended scaffolding system supported by cyclone separators,\" which effectively solved the problem of a lack of support points for work at heights, demonstrating a high level of technical expertise and engineering adaptability. The lifting operation began at 9 a.m. and continued until 1:30 a.m. the following day. Throughout the process, the team overcame challenges such as strong winds at high altitudes and limited visibility, strictly followed the lifting plan, and achieved millimeter-level precision in the translation and alignment of the thousand-ton components, ultimately completing the installation successfully. The lifting was completed 20 hours ahead of the original schedule, earning high praise from the client. The project team stated that it will use this breakthrough as an opportunity to continue strengthening quality control and technological innovation, accumulate experience in the field of large-scale equipment maintenance, and lay a solid foundation for the progress of subsequent projects.
Reply #22025-12-24
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32025-12-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first commercial supercritical carbon dioxide power generation unit was successfully put into operation in Liupanshui, Guizhou, from 2911 to 2025. https://bbs.hcbbs.com/thread-5708920-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42025-12-24
【Ten Years of Rapid Development in Chemical Processing Equipment】The first domestically produced high-sulfur content compression unit at the Puguang Gas Field has operated for over 20,000 hours (2914–2025) https://bbs.hcbbs.com/thread-5709131-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-12-25
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #62025-12-25
【Ten Years of Rapid Development in Chemical Equipment】2915-2025 – Amazing! China achieves for the first time the high-temperature cooling and transportation of oil, gas, and water mixtures using offshore unmanned platforms https://bbs.hcbbs.com/thread-5709132-1-1.html (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #72025-12-26
【Ten Years of Rapid Development in Chemical Equipment】The first electrocracking furnace in China was successfully put into operation at Dushanzi Petrochemical Company between 2016 and 2025. https://bbs.hcbbs.com/thread-5709248-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #82025-12-26
【Ten Years of Rapid Development in Chemical Equipment】From 2018 to 2025, Shandong Zhanggu successfully developed its first domestically produced TEP steam compressor, which was then shipped out. https://bbs.hcbbs.com/thread-5709282-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #92025-12-26
【Ten Years of Rapid Development in Chemical Equipment】The pilot production base of the Hami High-Oil Coal Research Institute, covering the period 2020–2025, was officially put into use in Yiwu County. https://bbs.hcbbs.com/thread-5709304-1-1.html (Source: Haichuan Chemical Forum (Hcbbs))
Reply #102025-12-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest single PEM hydrogen production electrolyzer was successfully produced at CRRC in Zhuzhou from 2921 to 2025. https://bbs.hcbbs.com/thread-5709309-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112025-12-27
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2024 to 2025! ! Two breakthroughs in domestic high-end electric drives: ultra-high-speed motors capable of operating at 10,000 revolutions per minute and motors with a vacuum distribution capacity of 100,000 have passed certification. https://bbs.hcbbs.com/thread-5709405-1-1.html (Source: HCBBS Chemical Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.