HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Filing for the energy-related component of the integrated wind-solar hydrogen production project in Hainan Province, operated by China General Nuclear Power Group Solar Energy Development Co., Ltd

2025-12-15View Original

Thread Content

Recently, information from the Online Approval Service Hall for Investment Projects in Inner Mongolia showed that the project registration application for the energy-related component of the integrated wind and solar hydrogen production project carried out by CGN Solar Development Co., Ltd. in Hainan District, submitted by CGN (Wuhai Hainan District) New Energy Co., Ltd., meets the industry policies and market access standards; therefore, its registration was approved. Construction location: Wuhai City – Hainan District – Low-Carbon Industrial Park in Wuhai High-Tech Industry Development Zone. Total investment: 404,118,800 yuan, of which self-funded amount is 121,235,640 yuan; bank loans applied for amount to 282,883,160 yuan, with no other funding sources. Planned construction period: from August 2025 to August 2026. Scale and scope of construction: The project will involve the construction of a hydrogen production plant with an output of 28,000 Nm3/h. This includes 28 units of alkaline water electrolysis equipment capable of producing hydrogen at a rate of 1,000 Nm3/h, along with associated gas-liquid separation and hydrogen purification systems. The purity of the produced hydrogen will be 99.999%. On July 21, the project registration notification stated that the energy-related project for the integrated wind and solar hydrogen production project in Hainan Province, submitted by CGN Solar Development Co., Ltd., met the industry policies and market access standards, and thus approval for registration was granted. Construction location: Wuhai City – Hainan District – Low-Carbon Industrial Park in Wuhai High-Tech Industry Development Zone. Total investment: 334,322,700 yuan, of which self-funded amount is 100,296,800 yuan, bank loans applied for amount to 234,025,900 yuan, and 0 yuan from other sources. Planned construction period: from August 2025 to August 2026. Construction scale and scope: The planned scale for this phase is a hydrogen production plant with an output of 32,000 Nm3/h. This includes 20 units of alkaline water electrolysis equipment with a capacity of 1,200 Nm3/h each, as well as 8 units of such equipment with a capacity of 1,000 Nm3/h each, along with accompanying gas-liquid separation and hydrogen purification systems. The purity of the produced hydrogen will be 99.999%.
Reply #22025-12-15
【Ten Years of Rapid Development in Chemical Equipment】From 2886 to 2025: China’s first industrial production project using its own technology for hexanitrobenzene via the butadiene process – Tianchen Qixiang New Materials’ 200,000-ton/year hexanitrobenzene production facility has reached full capacity. https://bbs.hcbbs.com/thread-5707419-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #32025-12-16
【Haichuan Equipment Guessing Game】What device is this that looks like a Katyusha? https://bbs.hcbbs.com/thread-5708487-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #42025-12-16
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #52025-12-16
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2897 to 2025: CNOOC’s equipment development efforts led to the successful application of multi-functional robots for coating treatment of crude oil storage tanks. https://bbs.hcbbs.com/thread-5708161-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62025-12-16
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2900 to 2025: Beijing Aerospace Power Research Institute developed China’s first polyolefin crushing and feeding machine, which has been in operation at a polyolefin plant in Tianjin for over 30 days. https://bbs.hcbbs.com/thread-5708326-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #72025-12-19
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2025, Beijing Haideliz developed and delivered a 30-kilowatt methanol-hydrogen combined heat and power system on its own https://bbs.hcbbs.com/thread-5708466-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82025-12-20
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2025, Beijing Haideliz developed and delivered a 30-kilowatt methanol-hydrogen combined heat and power system on its own https://bbs.hcbbs.com/thread-5708466-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92025-12-20
【Ten Years of Rapid Development in Chemical Equipment】World’s largest high-end bimodal HDPE dryer with capacity up to 2904–2025 has been installed https://bbs.hcbbs.com/thread-5708513-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #102025-12-21
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs from 2905 to 2025! SHanghai Electric’s 300MW-class large-scale air turbines ensure the operation of China’s salt-cave compressed air energy storage demonstration project https://bbs.hcbbs.com/thread-5708518-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112025-12-21
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs from 2905 to 2025! SHanghai Electric’s 300MW-class large-scale air turbines ensure the operation of China’s salt-cave compressed air energy storage demonstration project https://bbs.hcbbs.com/thread-5708518-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.