The second phase of the gasification project at Shaanxi Coal and Chemical Industry Yulin is hitting several important construction milestones; the project continues to progress steadily

2026-04-15View Original

Thread Content

The second phase of the coal gasification project at Shaanxi Coal Yulin Chemical is reaching important construction milestones one after another, with the project progressing steadily. The frame box columns of Unit 2 were successfully lifted, with the lifting process carried out in a safe and compliant manner, and all steps were executed in an orderly fashion; The No. 2 coal grinding unit was successfully capped one day ahead of schedule, achieving phased progress in the construction of its main structure ; Completed over 400 tons of rebar binding and the installation of more than 1,000 embedments efficiently within 20 days. During the construction period, all personnel involved rose to the challenges and worked around the clock to overcome difficulties such as a tight schedule, heavy workload, and frequent overlapping operations. To address the risks associated with work at heights, the project department focuses on strict safety management and seamless coordination of various construction processes, ensuring adherence to safety and quality standards in order to maintain smooth progress of the construction work.
Reply #22026-04-15
[3D Process Flow] Summary post -- Xinjiang Junggar’s 33.8 billion yuan green hydrogen industry chain: The entire process from wind/solar-powered hydrogen production to chemical utilization https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717774 (Source: Haichuan Chemical Forum (Huahai Chuanliu hcbbs))
Reply #32026-04-15
[3D Process Flow] Summary post -- Xinjiang Junggar’s 33.8 billion yuan green hydrogen industry chain: The entire process from wind/solar-powered hydrogen production to chemical utilization https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717774 (Source: Haichuan Chemical Forum (Huahai Chuanliu hcbbs))
Reply #42026-04-15
[HaiChuan Safety Forum] Hidden dangers around us – The pressure gauge’s sensing point should be located below the horizontal pipe https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717839 (Source: HaiChuan Chemical Engineering Forum (HCBBS))
Reply #52026-04-15
【Ten Years of Rapid Development in Chemical Engineering Equipment】3083-2026: SHENGU manufactures China’s first single-stage cantilevered fully assembled centrifugal compressor https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717804 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62026-04-16
【Ten Years of Rapid Development in Chemical Equipment】Successful one-time commissioning of the world’s first process for producing ethylene glycol from light hydrocarbons, 3085–2026, in Lianyungang https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717840 (Source: Haichuan Chemical Forum (HCBBS))
Reply #72026-04-18
【Haichuan Equipment Guessing Game】What is tied to the pipe? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718037 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #82026-04-19
【Ten Years of Rapid Development in Chemical Equipment】Successful one-time commissioning of the world’s first process for producing ethylene glycol from light hydrocarbons, 3085–2026, in Lianyungang https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717840 (Source: Haichuan Chemical Forum (HCBBS))
Reply #92026-04-19
【Thorough Discussion on HaiChuan Modular Installation】Summary post – everyone is welcome to join the discussion! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=1773168 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #102026-04-19
[History of Haichuan Chemical] Compilation post -- Observing its development through history! Constantly being updated! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718076 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #112026-04-21
【In-depth Discussion on Modular Installation of HaiChuan】The first module of China’s first cross-sea pipeline corridor project has been transported, lifted, and slid into place! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718213 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.