HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Erection of the steel structural truss for the No. 4 pipeline corridor overpass in Nantong Blue Sea New Materials project

2025-12-19View Original

Thread Content

On December 14, the construction site of Pipe Gallery No. 4 for the Nantong Blue Sea New Materials project at the Fifth Branch reached a key milestone: a steel structural truss measuring 33.5 meters in length, 12.3 meters in width, 2.94 meters in height, and weighing 68 tons was successfully lifted across the main road within the factory complex with the close coordination of two cranes, and was precisely placed on the supports of the pipe gallery. This marked a significant breakthrough in the plant’s process and thermal pipeline systems, laying a solid foundation for the overall connection of energy and materials between various units. It is reported that the steel structural truss lifted this time serves as the \"vital link\" in the plant’s material transportation and energy supply system for the Nantong Blue Sea New Materials project. Among them, the process piping network includes the connection pipes from raw materials to the production units, from the production units to the intermediate product storage areas, from the intermediate product storage areas to the product storage areas, and from the intermediate product storage areas to downstream production units ; The utility pipeline network includes heating pipelines, water supply and drainage pipelines, hot and cold water pipelines in heat exchange stations, as well as flare pipelines, and it serves as an essential foundation for ensuring the safe, stable, and efficient operation of the facility. To minimize the construction timeline and reduce risks associated with work at heights, the project team carried out thorough planning and coordination, adopting a construction method that involves overall assembly on the ground followed by a single lift. For this lifting operation, a 700-ton truck crane was used as the main crane, with a 200-ton truck crane serving as the auxiliary crane. The two cranes worked together to lift the load simultaneously. By strictly following the lifting plan and adhering to the requirements for safety procedures, the 68-ton steel structural truss was lifted into place in one go, allowing for an accurate alignment. The entire process was smooth and orderly, demonstrating the project team’s excellent technical skills and efficient organizational capabilities.
Reply #22025-12-20
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2025, Beijing Haideliz developed and delivered a 30-kilowatt methanol-hydrogen combined heat and power system on its own https://bbs.hcbbs.com/thread-5708466-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #32025-12-20
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and text; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #42025-12-20
【Ten Years of Rapid Development in Chemical Engineering Equipment】2903-2025: Domestic sea water pumps for the Shanghai Apollo Jiangsu LNG receiving station passed operational tests https://bbs.hcbbs.com/thread-5708495-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-12-21
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs from 2905 to 2025! SHanghai Electric’s 300MW-class large-scale air turbines ensure the operation of China’s salt-cave compressed air energy storage demonstration project https://bbs.hcbbs.com/thread-5708518-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62025-12-21
【Haichuan Black Technology】What’s it like to wear polyimide, a rocket insulation material? https://bbs.hcbbs.com/thread-5708925-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #72025-12-21
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs from 2905 to 2025! SHanghai Electric’s 300MW-class large-scale air turbines ensure the operation of China’s salt-cave compressed air energy storage demonstration project https://bbs.hcbbs.com/thread-5708518-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82025-12-21
【Ten Years of Rapid Development in Chemical Equipment】2907-2025: China’s First Civilian Liquid Hydrogen Plant Obtains Safety Production License https://bbs.hcbbs.com/thread-5708618-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #92025-12-21
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest 9600 Nm³/h multi-functional hydrogen production BOP system was successfully delivered https://bbs.hcbbs.com/thread-5708761-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102025-12-22
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2009 to 2025, Ningmei Group made significant progress in the key technologies related to the extraction of rare gases such as krypton and xenon from ultra-large air separation units. https://bbs.hcbbs.com/thread-5708777-1-1.html (Source: Hachuan Chemical Industry Forum (Hcbbs))
Reply #112025-12-22
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2009 to 2025, Ningmei Group made significant progress in the key technologies related to the extraction of rare gases such as krypton and xenon from ultra-large air separation units. https://bbs.hcbbs.com/thread-5708777-1-1.html (Source: Hachuan Chemical Industry Forum (Hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.