Zhejiang Changhong Biomedical Materials’ project to produce 50,000 tons per year of high-end fiber elastomer materials, along with a facility for manufacturing 100,000 tons per year of PBAT black masterbatches, with an investment of 1.03 billion yuan

2025-12-24View Original

Thread Content

Project Name: Zhejiang Changhong Biomedical Materials Co., Ltd. – Project for the annual production of 50,000 tons of high-end fiber elastomer materials, along with a facility for the annual production of 100,000 tons of PBAT black masterbatches. Launch Date: December 24, 2025. Location: Zhejiang. Industry/Project Type: Chemicals and Pharmaceuticals/Chemical Raw Materials and Chemical Products/Synthetic Materials; New infrastructure and new industries/new materials project: Owner – Zhejiang Changhong Biomedical Materials Co., Ltd. Total investment: 1,030 million yuan. Current progress: The project has been registered. Location of construction: No. 618, Mingxinling Road, Yanhu Sub-district, Zhejiang Province. Scope of construction: The facility is designed to produce 50,000 tons per year of high-end fiber elastomer materials, along with 100,000 tons per year of PBAT black masterbatch. Among them, the high-end fiber elastomer plant is designed to operate for 8,000 hours per year; its design elasticity ranges from 50% to 110%. The products produced include 50,000 tons of poly**furan (MW1800/MW2000), 2,250 tons of low-molecular-weight P250 (a by-product), and 7,500 tons of crude methyl acetate (75%, also a by-product). The PBAT black masterbatch production facility employs a dual-heater process and is designed with 3 production lines (1 line with a capacity of 50,000 tons per year, 1 line with 30,000 tons per year, and 1 line with 20,000 tons per year). The designed annual operating time is 8,000 hours, with a capacity flexibility range of 50% to 110%. The products produced are hard black masterbatches such as N220 and N330, which are used in PBAT-modified products as well as in film blowing processes. Progress milestone: December 23, 2025 – Project registration completed (Project registration)
Reply #22025-12-24
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32025-12-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first commercial supercritical carbon dioxide power generation unit was successfully put into operation in Liupanshui, Guizhou, from 2911 to 2025. https://bbs.hcbbs.com/thread-5708920-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42025-12-24
【Ten Years of Rapid Development in Chemical Processing Equipment】The first domestically produced high-sulfur content compression unit at the Puguang Gas Field has operated for over 20,000 hours (2914–2025) https://bbs.hcbbs.com/thread-5709131-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-12-25
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #62025-12-25
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs from 2905 to 2025! SHIHE Electric’s 300MW-class large-scale air turbines ensure the operation of China’s salt-cave compressed air energy storage demonstration project https://bbs.hcbbs.com/thread-5708518-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72025-12-26
【Ten Years of Rapid Development in Chemical Equipment】The first electrocracking furnace in China was successfully put into operation at Dushanzi Petrochemical Company between 2016 and 2025. https://bbs.hcbbs.com/thread-5709248-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #82025-12-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest single PEM hydrogen production electrolyzer was successfully produced at CRRC in Zhuzhou from 2921 to 2025. https://bbs.hcbbs.com/thread-5709309-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92025-12-27
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2024 to 2025! ! Two breakthroughs in domestic high-end electric drives: ultra-high-speed motors capable of operating at 10,000 revolutions per minute and motors with a vacuum distribution capacity of 100,000 have passed the evaluation tests. https://bbs.hcbbs.com/thread-5709405-1-1.html (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.