Thread Content
The hydrogen production phase of CRRC’s 216,000 Nm³/h green hydrogen project has been approved for registration. On December 22, information available on the Online Approval Portal for Investment Projects in Inner Mongolia Autonomous Region showed that the industrial project registration application submitted by Zhalaiye Hydrogen Innovation Energy Co., Ltd. for the 2 million kilowatt wind power-based hydrogen production integrated project in Zhalaiye County, Xing’an League, met the industry policies and market entry standards, and thus was approved for registration. Construction location: Xingan League – Ulanhot City – Xingan League-Ulanhot City – Xingan League Economic and Technological Development Zone in Inner Mongolia. Total investment: 3,644 million yuan, of which 728.8 million yuan comes from own funds, 2,915.2 million yuan will be obtained through bank loans, and 0 million yuan from other sources. Planned construction period: from December 2026 to December 2028. Scale and scope of the project: The project involves the construction of 216 alkaline electrolyzers with a capacity of 1,000 Nm³/h each, 54 gas-liquid separation and purification units with a capacity of 4,000 Nm³/h each, hydrogen compression facilities, 96 hydrogen storage tanks with a capacity of 2,000 cubic meters each, as well as supporting systems such as air compressors and cooling water systems. The hydrogen production capacity will be 216,000 Nm³/h; once the project is fully operational, it will be able to produce 80,000 tons of green hydrogen per year.
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first commercial supercritical carbon dioxide power generation unit was successfully put into operation in Liupanshui, Guizhou, from 2911 to 2025. https://bbs.hcbbs.com/thread-5708920-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first domestically produced high-sulfur content compression unit at the Puguang Gas Field has operated for over 20,000 hours (2914–2025) https://bbs.hcbbs.com/thread-5709131-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】2915-2025: Amazing! China achieves for the first time the high-temperature cooling and transportation of oil, gas, and water mixtures using offshore unmanned platforms https://bbs.hcbbs.com/thread-5709132-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】2915-2025: Amazing! China achieves for the first time the high-temperature cooling and transportation of oil, gas, and water mixtures using offshore unmanned platforms https://bbs.hcbbs.com/thread-5709132-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs from 2905 to 2025! SHIHE Electric’s 300MW-class large-scale air turbines ensure the operation of China’s salt-cave compressed air energy storage demonstration project https://bbs.hcbbs.com/thread-5708518-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The first electrocracking furnace in China was successfully put into operation at Dushanzi Petrochemical Company between 2016 and 2025. https://bbs.hcbbs.com/thread-5709248-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2018 to 2025, Shandong Zhanggu successfully developed its first domestically produced TEP steam compressor, which was then shipped out. https://bbs.hcbbs.com/thread-5709282-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest single PEM hydrogen production electrolyzer was successfully produced at CRRC in Zhuzhou from 2021 to 2025. https://bbs.hcbbs.com/thread-5709309-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2024 to 2025! ! Two breakthroughs in domestic high-end electric drives: ultra-high-speed motors capable of operating at tens of thousands of revolutions per minute, as well as motors with a vacuum distribution capacity of 100,000 units, have passed the evaluation process. https://bbs.hcbbs.com/thread-5709405-1-1.html (Source: Haimen Chemical Industry Forum (HCBBS))