On January 5, the third reactor (R-1203) of the Inner Mongolia Rongxin Chemical Project was successfully installed under precise control, marking a significant breakthrough in the installation of the project’s key equipment. The lifting of the first such reactor was completed successfully, laying a solid foundation for the subsequent installation of other equipment and the overall progress of the project. It is reported that this reactor weighs 140 tons, has a diameter of 5.1 meters and a length of 18.895 meters; it is the first oversized piece of equipment for this project. Its transportation was carried out using two crawler cranes, one with a capacity of 600 tons and the other with 240 tons, working together to lift it into place in one go. A 600-ton crawler crane lifted the reactor, this \"giant\", steadily; it took 2 hours, and the reactor was successfully placed in position. Over-size equipment is large in volume and difficult to transport, and the site where it is to be lifted is limited in space, posing challenges to the lifting process. To improve the installation efficiency of oversized equipment, various departments work closely together, monitor the equipment manufacturing process in a timely manner, mobilize skilled construction teams, and plan in advance as well as apply for routes for large-scale cranes to enter the site. At the same time, strengthen safety supervision and management to ensure the safe, high-quality, and efficient operation of equipment lifting operations involving oversized items. Before the lifting operation, the project department conducts on-site inspections to identify risks and potential hazards, provides safety and technical briefings, addresses the technical challenges associated with lifting, and controls the key safety risks, ensuring that the entire lifting process is carried out safely and in an orderly manner.
【Ten Years of Rapid Development in Chemical Engineering Equipment】Betel’s first domestically produced compressors equipped with anti-surge valves were successfully put into use between 2025 and 2955. https://bbs.hcbbs.com/thread-5710547-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】The 600KW high-power magnetic levitation air compressor produced by Tianrui Heavy Industry was successfully manufactured between 2021 and 2025. https://bbs.hcbbs.com/thread-5710707-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】2962-2025: Tianyuan Company’s first domestic laboratory facility for lignite carbonization in Shenmu’s coal chemical industry has been successfully put into operation. https://bbs.hcbbs.com/thread-5710802-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The bulk method ABS technology developed by Dalian University of Technology was successfully applied at Jilin Petrochemical Company from 2024 to 2026. https://bbs.hcbbs.com/thread-5710881-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The bulk method ABS technology developed by Dalian University of Technology was successfully applied at Jilin Petrochemical Company from 2024 to 2026. https://bbs.hcbbs.com/thread-5710881-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The bulk method ABS technology developed by Dalian University of Technology was successfully applied at Jilin Petrochemical Company from 2024 to 2026. https://bbs.hcbbs.com/thread-5710881-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】Yanhua Chemical’s new technology for \"constructing five new methanol distillation towers\" between 2025 and 2026 has passed **level of appraisal** https://bbs.hcbbs.com/thread-5710884-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】The world’s first industrial unit for high-pressure dry reforming with a capacity of 100 million cubic meters passed on-site evaluation from 2966 to 2026. https://bbs.hcbbs.com/thread-5710893-1-1.html (Source: Haichuan Chemical Forum (HCBBS))