HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Qujing Heijin Energy Co., Ltd.’s 1 million-ton coking transformation and upgrading project

2025-12-25View Original

Thread Content

Project Name: 1 million-ton coking transformation and upgrading project of Qujing Heijin Energy Co., Ltd.
Location: Huashan Chemical Industrial Park, Qujing High-tech Industrial Development Zone
Constructor: Qujing Heijin Energy Co., Ltd.
Environmental Assessment Agency: Yunnan Boxi Environmental Impact Assessment Co., Ltd.
Project Overview: Located in the Huashan Chemical Industrial Park of Qujing High-tech Industrial Development Zone, the project covers an area of 20.2119 hm2. According to the project approval document and the Report, the nature of the project is renovation. It is planned to construct 2×55-chamber JT5550D type coke ovens along with associated production lines. The main construction elements include 2×55-chamber, 5.5-meter single-heating type rammed coke ovens, as well as 1×140t/h dry quenching equipment; in addition, facilities such as a coal preparation system, devices for dust removal and nitrogen oxide reduction from coke oven exhaust gases, and a chemical product recovery system will also be installed. Auxiliary facilities include refrigeration plants, demineralized water plants, air compression stations, laboratories, etc. Storage and transportation facilities comprise liquid loading/unloading areas, oil storage units, internal transportation roads, gas pipelines, etc. Utility systems include water supply and drainage systems, circulating water systems, office and living areas, etc. Environmental protection facilities include exhaust gas treatment systems, wastewater treatment systems, solid waste disposal and utilization systems, etc. The total investment in this project is 1.45 billion yuan; upon completion, it will produce 1 million tons of coke, 16,073 tons of ammonium sulfate, 13,712 tons of crude benzene, and 50,860 tons of tar per year.
Reply #22025-12-25
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #32025-12-25
【Ten Years of Rapid Development in Chemical Equipment】2915-2025 – Amazing! China achieves for the first time the high-temperature cooling and transportation of oil, gas, and water mixtures using offshore unmanned platforms https://bbs.hcbbs.com/thread-5709132-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #42025-12-25
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first nationwide test of ammonia-fueled operation of marine low-speed engines under all operating conditions was carried out in Qingdao from 2925 to 2025. https://bbs.hcbbs.com/thread-5709443-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-12-25
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first nationwide test of ammonia-fueled operation of marine low-speed engines under all operating conditions was carried out in Qingdao from 2925 to 2025. https://bbs.hcbbs.com/thread-5709443-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62025-12-25
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Friends in the North, Check More! ! No warnings in place below where water vapor condenses into ice spikes in pipes https://bbs.hcbbs.com/thread-5709472-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #72025-12-26
【Ten Years of Rapid Development in Chemical Equipment】The first electrocracking furnace in China was successfully put into operation at Dushanzi Petrochemical Company between 2016 and 2025. https://bbs.hcbbs.com/thread-5709248-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #82025-12-26
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2018 to 2025, Shandong Zhanggu successfully developed its first domestically produced TEP steam compressor, which was then shipped out. https://bbs.hcbbs.com/thread-5709282-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92025-12-26
【Ten Years of Rapid Development in Chemical Engineering Equipment】The pilot production base of the Hami High-Oil Coal Research Institute, covering the period 2020–2025, was officially put into use in Yiwu County. https://bbs.hcbbs.com/thread-5709304-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102025-12-27
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2024 to 2025! ! Two breakthroughs in domestic high-end electric drives: ultra-high-speed motors capable of operating at tens of thousands of revolutions per minute and motors with a vacuum distribution capacity of 100,000 have passed certification. https://bbs.hcbbs.com/thread-5709405-1-1.html (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #112025-12-27
【Ten Years of Rapid Development in Chemical Equipment】From 2027 to 2025, Yanshan Petrochemical’s 1.2 million tons per year gasoline adsorption desulfurization unit became the first of its kind in China to obtain carbon neutrality certification. https://bbs.hcbbs.com/thread-5709493-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.